6.
First turn the maintenance switches OFF and sees if the inputs of the devices are
connected to each other.
7.
Then turn the maintenance switch ON and check the connection between the input of
the first device and the output of the second device.
8.
Use separate sets of batteries for each device. Do NOT use the same set of batteries on
more than one device at the same time.
9.
Connect the communication cable and secure the connections.
10.
Check the termination resistors on the connection cable.
11.
Remove the UPS top panel and reach the main board.
12.
Find the J9 socket on the main board, and check the resistance between pin 2 and pin 3
using a multimeter. (60Ω)
13.
Check the resistance between pin 4 and pin 5. (60Ω)
14.
Close the replace the UPS top panel. Turn on the device.
Summary of Contents for IST5 Series
Page 2: ...2 2 SERVICE MANUAL 10 15 20 30 40 60 80 100 120 160 200 300 KVA...
Page 6: ...9 9 2 PRODUCT DESCRIPTION 2 1 General View 10 15 20 30 40KVA...
Page 7: ...10 10 60 80KVA...
Page 8: ...11 11 100 120 160 200 300 KVA...
Page 13: ...16 16 2 5 Side Interior View 10 15 20 30 40KVA...
Page 16: ...19 19 2 7 Electrical Connections...
Page 35: ...38 38...
Page 36: ...39 39...
Page 51: ...54 54 30 40KVA 60 80 100 120 160 200 300 KVA...
Page 54: ...57 57...
Page 71: ...74 74 1 Turn CB2 ON 10 15 20KVA 30 40KVA...
Page 72: ...75 75 60 80 100 120KVA 2 Stop the UPS using the user front panel Main menu Control Stop...
Page 73: ...76 76 3 Turn CB1 CB3 and CB4 OFF 10 15 20KVA 30 40KVA...
Page 100: ...103 103 Signal Flow Diagram zole trafo means isolated transformer...
Page 102: ...105 105 20 30KVA IGBT Driver 40KVA IGBT Driver...