7
.75 ALL THREAD
.75 NUT
.75 SPLIT WASHER
.75 FLAT WASHER
MASTERLINK
-001 13.00"
-002 19.00"
-003 25.00"
-004 32.00"
-005 38.00"
TIGHTENING CHAIN LENGTHS
Figure 8 Adjustment Assembly
9)
Place the flat washer, split washer and Nut on All Thread.
10)
Screw Nut onto All-Thread until top of Nut is level with top of All-Thread. Final
tightening may be done after mounting chain is in place.
11)
If applicable, remove Sample Probe Access Plate from inside the enclosure
by removing the 6 Phillips head screws and lifting the Access Plate with
attached insulation from hole (see Figure 9).
NOTE:
Lift enclosure above meter run allowing enough clearance to clear pipe
and installed Sample Probe if applicable.
SAMPLE PROBE ACCESS PLATES
Figure 9 Sample Probe Access Plates
12)
Set enclosure on top of pipe in between the angle iron mounting brackets,
being careful to insert sample probe through corresponding hole if applicable.
Keep unit steady on top of pipe.
13)
Wrap mounting chain underneath pipe (see Figure 10). Feed chain up
through square retainer hole of angle iron and pull up until most of the slack
has been taken out of mounting chain.