Note
Action
Rotation tool, 3HAB7887-1
xx2100002205
Use caution and lower the motor into posi-
tion on the guide pins, while at the same
time rotating the motor pinion slightly.
Make sure that:
•
the motor pinion is properly mated
to the gear of the gearbox.
•
the motor pinion does not get dam-
aged.
•
the direction of the cable exit is fa-
cing the same way as before remov-
al.
6
Remove the guide pins.
7
Tightening torque: 24 Nm.
Secure the motor with its attachment
screws and washers.
8
Hex socket head cap screw: (4)
M10x30 12.9 Gleitmo 603+Geomet 500 (
IRB
5720-180/2.6
,
IRB 5720-155/2.6 LID
)
M8x25 12.9 Gleitmo 603+Geomet 500 (
IRB
5720-125/3.0
,
IRB 5720-90/3.0 LID
)
xx2100002204
See
Performing a leak-down test on
Perform a leak-down test.
9
Disconnect the brake release tool.
10
Connecting the axis-5 motor cables
Note
Action
Put the motor cables in place in the open-
ing.
1
Torx pan head screw: M3x12 Stainless
steel A2-70
Refit the cable bracket with the screws.
2
Connect the motor cables.
3
Connect in accordance with the markings
on the connectors.
Tightening torque: 1 Nm
Secure the power connector with a screw.
4
Continues on next page
394
Product manual - IRB 5720
3HAC079195-001 Revision: A
© Copyright 2022 ABB. All rights reserved.
5 Repair
5.8.5 Replacing the axis-5 motor
Continued
Summary of Contents for IRB 5710
Page 1: ...ROBOTICS Product manual IRB 5720 ...
Page 8: ...This page is intentionally left blank ...
Page 14: ...This page is intentionally left blank ...
Page 36: ...This page is intentionally left blank ...
Page 186: ...This page is intentionally left blank ...
Page 580: ...This page is intentionally left blank ...
Page 604: ...This page is intentionally left blank ...
Page 609: ......