Replacing complete tubular shaft unit .........................................................
Measuring the play, axis 5 ........................................................................
Measuring the play, axis 6 .........................................................................
Replacing the lower arm ...........................................................................
Replacing stop pin axis 1 ..........................................................................
Removing motors ....................................................................................
Adjusting the play of axis 4, 5 and 6 motors .................................................
Replacing gearbox axis 1 ..........................................................................
Replacing gearbox axis 2 ..........................................................................
Replacing gearbox axis 3 ..........................................................................
Upper arm IRB 4600-60/2.05, -40/2.05-40/2.50, -20/2.55 ............................................
3HAC033453-001 Revision: H
7
© Copyright 2009-2013 ABB. All rights reserved.
Table of contents
Summary of Contents for IRB 4600 - 20/2.50
Page 1: ...ABB Robotics Product manual IRB 4600 ...
Page 108: ...This page is intentionally left blank ...
Page 318: ...This page is intentionally left blank ...
Page 332: ...This page is intentionally left blank ...
Page 373: ......