Note
Equipment
These procedures include references to the
tools required.
Other tools and procedures may be re-
quired. See references to these procedures
in the step-by-step instructions below.
Removing the stop pin, axis 1
Use this procedure to remove the stop pin axis 1.
Note
Action
DANGER
Turn off all:
•
electric power supply
•
hydraulic pressure supply
•
air pressure supply
to the robot, before entering the robot
working area.
1
See the figure in
•
Location of stop pin axis 1 on
page 275
Remove the
attachment screws
securing
the
bracket
and
stop pin
.
2
See the figure in
•
Location of stop pin axis 1 on
page 275
Remove the
bracket
and
stop pin
.
3
Refitting the stop pin, axis 1
Use this procedure to refit the stop pin axis 1.
Note
Action
DANGER
Turn off all:
•
electric power supply
•
hydraulic pressure supply
•
air pressure supply
to the robot, before entering the robot
working area.
1
See the figure in
•
Location of stop pin axis 1 on
page 275
Fit the two
o-rings
on the stop pin.
2
Continues on next page
276
3HAC033453-001 Revision: H
© Copyright 2009-2013 ABB. All rights reserved.
4 Repair
4.6.1 Replacing stop pin axis 1
Continued
Summary of Contents for IRB 4600 - 20/2.50
Page 1: ...ABB Robotics Product manual IRB 4600 ...
Page 108: ...This page is intentionally left blank ...
Page 318: ...This page is intentionally left blank ...
Page 332: ...This page is intentionally left blank ...
Page 373: ......