Note
Action
DANGER
Turn off all:
•
electric power supply
•
hydraulic pressure supply
•
air pressure supply
to the robot, before entering the robot
working area.
2
How to drain the gearbox is described in sec-
tion:
•
Changing the oil, axis-2 gearbox on
page 162
Drain the gearbox.
3
A
B
C
xx1100000946
A Cable bracket
B Cable bracket
C Cable strap
Loosen the cabling from the lower arm
by removing two cable brackets and a
cable strap.
4
Attach a roundsling around the upper
arm house.
5
Unload the weight of the lower and
upper arm package by stretching the
roundslings with the overhead crane.
Turn on the power temporarily and re-
lease the brakes of axis 2 to rest the
weight onto the roundslings.
6
DANGER
Turn off all:
•
electric power supply
•
hydraulic pressure supply
•
air pressure supply
to the robot, before entering the robot
working area.
7
Continues on next page
3HAC033453-001 Revision: H
305
© Copyright 2009-2013 ABB. All rights reserved.
4 Repair
4.8.2 Replacing gearbox axis 2
Continued
Summary of Contents for IRB 4600 - 20/2.50
Page 1: ...ABB Robotics Product manual IRB 4600 ...
Page 108: ...This page is intentionally left blank ...
Page 318: ...This page is intentionally left blank ...
Page 332: ...This page is intentionally left blank ...
Page 373: ......