![ABB IRB 2400 Series Product Manual Download Page 170](http://html.mh-extra.com/html/abb/irb-2400-series/irb-2400-series_product-manual_5033170.webp)
Note/Illustration
Action
Shown in the figure
Remove the
cover
of the connection box.
2
xx0200000401
Disconnect the connectors R3.MP1 and R3.FB1.
3
•
A: R3.MP1
•
B: R3.FB1
•
C: Connection box
Shown in the figure
.
Remove the
connection box
by unscrewing its
three attachment screws and plain washers.
4
xx0600002646
Use a marker pen to mark the position of the
motor (A), if the same motor is to be refitted.
5
Shown in the figure
.
Unscrew the four
attachment screws and
washers
of the motor.
6
Gently lift the motor straight up, making sure
not to damage the motor pinion.
7
Refitting, motor axis 1
The procedure below details how to refit the motor, axis 1.
Note/Illustration
Action
DANGER
Turn off all electric power, hydraulic and pneumat-
ic pressure supplies to the robot!
1
Check that the assembly surfaces are clean and
the motor is un-scratched.
2
Always fit a new one, see article
number in
.
Fit the new
o-ring
.
3
Continues on next page
170
Product manual - IRB 2400
3HAC022031-001 Revision: P
© Copyright 2004-2018 ABB. All rights reserved.
4 Repair
4.7.1 Replacement of motor, axis 1
Continued
Summary of Contents for IRB 2400 Series
Page 1: ...ROBOTICS Product manual IRB 2400 ...
Page 8: ...This page is intentionally left blank ...
Page 18: ...This page is intentionally left blank ...
Page 204: ...This page is intentionally left blank ...
Page 220: ...This page is intentionally left blank ...
Page 232: ...This page is intentionally left blank ...
Page 234: ...This page is intentionally left blank ...
Page 240: ......
Page 241: ......