
Table of contents
Safety during installation, commissioning and decommissioning ................................
Unpacking and positioning ........................................................................
Assemble corridor parts ...........................................................................
Assemble the vision tower ........................................................................
Install the FlexMT to the machine ...............................................................
Install FlexMT drop protection ...................................................................
Safety precautions for long parts in turn station ............................................
Machine tool safety interface .....................................................................
Machine tool functional interface ................................................................
Robot base coordinate system ...................................................................
Calibration of coordinate systems ..............................................................
Further integration steps ..........................................................................
Configuration changes .............................................................................
3HAC051768-001 Revision: -
5
© Copyright 2014-2014 ABB. All rights reserved.
Table of contents
Summary of Contents for FlexMT
Page 1: ...Product manual FlexMT ...
Page 10: ...This page is intentionally left blank ...
Page 12: ...This page is intentionally left blank ...
Page 56: ...This page is intentionally left blank ...
Page 78: ...This page is intentionally left blank ...
Page 92: ...This page is intentionally left blank ...
Page 112: ...This page is intentionally left blank ...
Page 206: ...This page is intentionally left blank ...
Page 224: ...This page is intentionally left blank ...
Page 236: ...This page is intentionally left blank ...
Page 242: ...This page is intentionally left blank ...
Page 244: ......
Page 245: ......