2.3.3 Potential equalization
FlexMT is equipped with a earthing boss, the earthing boss is fitted on the base
frame to the left of the control panel, this shall be connected to a separate functional
earthing bonding circuit conductor.
NOTE: Do not connect this to the PE system!
3HAC051768-001 Revision: -
47
© Copyright 2014-2014 ABB. All rights reserved.
2 Installation
2.3.3 Potential equalization
Summary of Contents for FlexMT
Page 1: ...Product manual FlexMT ...
Page 10: ...This page is intentionally left blank ...
Page 12: ...This page is intentionally left blank ...
Page 56: ...This page is intentionally left blank ...
Page 78: ...This page is intentionally left blank ...
Page 92: ...This page is intentionally left blank ...
Page 112: ...This page is intentionally left blank ...
Page 206: ...This page is intentionally left blank ...
Page 224: ...This page is intentionally left blank ...
Page 236: ...This page is intentionally left blank ...
Page 242: ...This page is intentionally left blank ...
Page 244: ......
Page 245: ......