2.2.6 Install the FlexMT to the machine
Note
The fastenening elements are not part of the delivery as they must be selected
with reference to the floor material. Use only suitable fastening elements. Pay
attention to the expected loads.
CAUTION
The conveyor must be levelled both in the direction of movement and across it
within < 5 mm/m ( < 1 mm/m for rolling parts). Each deviation must be corrected.
If the wholes are drilled prior to putting the FlexMT into position use the following
drilling plan. Pay attention to distances implied by extension panel options.:
FlexMT drilling template (in mm), seen from above (1)
Continues on next page
3HAC051768-001 Revision: -
39
© Copyright 2014-2014 ABB. All rights reserved.
2 Installation
2.2.6 Install the FlexMT to the machine
Summary of Contents for FlexMT
Page 1: ...Product manual FlexMT ...
Page 10: ...This page is intentionally left blank ...
Page 12: ...This page is intentionally left blank ...
Page 56: ...This page is intentionally left blank ...
Page 78: ...This page is intentionally left blank ...
Page 92: ...This page is intentionally left blank ...
Page 112: ...This page is intentionally left blank ...
Page 206: ...This page is intentionally left blank ...
Page 224: ...This page is intentionally left blank ...
Page 236: ...This page is intentionally left blank ...
Page 242: ...This page is intentionally left blank ...
Page 244: ......
Page 245: ......