Check-List for Mounting
12-6
Was the cable sheath stripped off properly? Was the cable connected properly
to the contact ledge?
Are the connectors fastened with screws?
Was the terminal block connected properly? Did you check the connection?
Did you mind the fact that other nodes may cancel out the protective
separation?
With redundancy:
Is the connection between the terminal blocks correct?
Did you choose external termination? Is external termination supply provided?
Is the internal termination disabled?
With RS422, only
Did you select either internal or external termination?
With internal termination:
Is the termination active, if the module is located at the end of the bus?
With external termination:
Were both cable ends terminated properly?
Is the internal termination disabled?
Is a 1 k
Ω
pull-up, 100
Ω
and 1 k
Ω
pull-down resistance circuitry used as the
external termination?
Is an external 5-V power supply provided for external termination?
Were all connector pins not assigned to RS422 left free?
Is the appropriate cable used (sufficient wire CSA, shielded)?
Was the connector shield applied to terminal P?
Was the cable sheath stripped off properly? Was the cable connected properly
to the contact ledge?
Were the connectors fastened with screws?
Was the terminal block connected properly? Did you check the connection?
Did you mind the fact that other nodes may cancel out the protective
separation?
With redundancy:
Is the connection between the terminal blocks correct?
Did you choose external termination? Is external termination supply provided?
Was the internal termination disabled?
Summary of Contents for AC 800F
Page 1: ... PROCESS AUTOMATION Freelance 2019 Mounting and Installation Instructions AC 800F Controller ...
Page 2: ......
Page 66: ...3 Mounting the AC 800F 3 38 ...
Page 168: ...4 Cabling the AC 800F 4 102 ...
Page 290: ...7 Functional Description of the Fieldbus Modules 7 36 ...
Page 317: ...10 Approvals certificates 10 1 10 Approvals certificates 10 1 ISO 9001 Fig 10 1 ISO 9001 ...
Page 318: ...10 Approvals certificates 10 2 Fig 10 2 ISO 9001 ...
Page 319: ...10 Approvals certificates 10 3 Fig 10 3 ISO 9001 ...
Page 320: ...10 Approvals certificates 10 4 Fig 10 4 ISO 9001 ...
Page 321: ...10 Approvals certificates 10 5 10 2 ISO 9000 Fig 10 5 ISO 9000 ...
Page 322: ...10 Approvals certificates 10 6 Fig 10 6 ISO 9000 ...
Page 323: ...10 Approvals certificates 10 7 10 3 CE Fig 10 7 CE certificate page 1 ...
Page 324: ...10 Approvals certificates 10 8 Fig 10 8 CE certificate page 2 ...
Page 325: ...10 Approvals certificates 10 9 Fig 10 9 CE certificate page 3 ...
Page 326: ...10 Approvals certificates 10 10 Fig 10 10CE certificate supplement ...
Page 327: ...10 Approvals certificates 10 11 10 4 CSA Fig 10 11 CSA certificate page 1 ...
Page 328: ...10 Approvals certificates 10 12 Fig 10 12 CSA certificate page 2 ...
Page 329: ...10 Approvals certificates 10 13 Fig 10 13 CSA certificate page 3 ...
Page 330: ...10 Approvals certificates 10 14 Fig 10 14 CSA certificate page 4 ...
Page 331: ...10 Approvals certificates 10 15 10 5 UL Fig 10 15 UL certificate ...
Page 332: ...10 Approvals certificates 10 16 Fig 10 16 UL certificate page 2 ...
Page 333: ...10 Approvals certificates 10 17 Fig 10 17 UL certificate page 3 ...
Page 334: ...10 Approvals certificates 10 18 Fig 10 18 UL certificate page 4 ...
Page 335: ...10 Approvals certificates 10 19 10 6 GUS certificate Fig 10 19 GUS certificate ...
Page 369: ...13 Glossary 13 18 Component of the Freelance 2000 System ...
Page 378: ......