![ABB AC 800F Mounting And Installation Instructions Manual Download Page 302](http://html.mh-extra.com/html/abb/ac-800f/ac-800f_mounting-and-installation-instructions-manual_2903302.webp)
8
Accessories
8-12
8.2.4
Hardware structure
The battery module contains the following hardware components:
•
EEPROM for configuration data
•
Isolator for electrical isolation of the bus signals to allow for plugging and removal
of the module while the AC 800F is running
•
Battery holder with polarity reversal protection
•
Battery status monitoring circuit with Batt low signal and yellow status indicator
LED Battery.
Block diagram
Fig. 8-6
Battery module block diagram
Buffer battery
The 3.6 V lithium battery SB 808F, which is to be inserted in the battery holder
SY 809F is included in the scope of delivery of battery module AM 811F.
The battery holder can be removed and plugged in at any time, while the module is
switched off or while it is running.
When the AC 800F is off, removing the battery holder when no module
with a buffer battery resides in the other E slot will cause a data loss.
The data in the main memory and the configuration of the real-time
clock will be lost then.
Summary of Contents for AC 800F
Page 1: ... PROCESS AUTOMATION Freelance 2019 Mounting and Installation Instructions AC 800F Controller ...
Page 2: ......
Page 66: ...3 Mounting the AC 800F 3 38 ...
Page 168: ...4 Cabling the AC 800F 4 102 ...
Page 290: ...7 Functional Description of the Fieldbus Modules 7 36 ...
Page 317: ...10 Approvals certificates 10 1 10 Approvals certificates 10 1 ISO 9001 Fig 10 1 ISO 9001 ...
Page 318: ...10 Approvals certificates 10 2 Fig 10 2 ISO 9001 ...
Page 319: ...10 Approvals certificates 10 3 Fig 10 3 ISO 9001 ...
Page 320: ...10 Approvals certificates 10 4 Fig 10 4 ISO 9001 ...
Page 321: ...10 Approvals certificates 10 5 10 2 ISO 9000 Fig 10 5 ISO 9000 ...
Page 322: ...10 Approvals certificates 10 6 Fig 10 6 ISO 9000 ...
Page 323: ...10 Approvals certificates 10 7 10 3 CE Fig 10 7 CE certificate page 1 ...
Page 324: ...10 Approvals certificates 10 8 Fig 10 8 CE certificate page 2 ...
Page 325: ...10 Approvals certificates 10 9 Fig 10 9 CE certificate page 3 ...
Page 326: ...10 Approvals certificates 10 10 Fig 10 10CE certificate supplement ...
Page 327: ...10 Approvals certificates 10 11 10 4 CSA Fig 10 11 CSA certificate page 1 ...
Page 328: ...10 Approvals certificates 10 12 Fig 10 12 CSA certificate page 2 ...
Page 329: ...10 Approvals certificates 10 13 Fig 10 13 CSA certificate page 3 ...
Page 330: ...10 Approvals certificates 10 14 Fig 10 14 CSA certificate page 4 ...
Page 331: ...10 Approvals certificates 10 15 10 5 UL Fig 10 15 UL certificate ...
Page 332: ...10 Approvals certificates 10 16 Fig 10 16 UL certificate page 2 ...
Page 333: ...10 Approvals certificates 10 17 Fig 10 17 UL certificate page 3 ...
Page 334: ...10 Approvals certificates 10 18 Fig 10 18 UL certificate page 4 ...
Page 335: ...10 Approvals certificates 10 19 10 6 GUS certificate Fig 10 19 GUS certificate ...
Page 369: ...13 Glossary 13 18 Component of the Freelance 2000 System ...
Page 378: ......