17
EN_40_070_0010I
|
Service manual | Lamp replacement and calibration - Corona process
Replacing halogen lamps
Lamp replacement and calibration Corona process
1
Closing the control
software
Close the
InProcess
control software.
2
Cut off the power supply
Cut off the power supply to the
Corona process
measuring system.
3
Set up ESD work station
Carry out the activities described below at an ESD work station.
4
Prepare spare parts
Prepare the following spare parts:
– Spare lamps, 2x, order no. 000000-2219-967
– Cable connector, screw-on, 1x
Note
Always replace both halogen lamps at once.
5
Prepare tools and materials
Prepare the following tools and materials:
– the tools belonging to the
Corona process
calibration device
ȩ
8 mm spanner
ȩ
TX 10 and TX 25 screwdrivers
– additionally necessary tools and materials:
ȩ
22 mm spanner
ȩ
6 mm hex wrench
ȩ
Phillips screwdriver PH2 (for older device versions)
ȩ
Cotton gloves
Procedure