
3-13
IM AQ1210-01EN
Performing Real-time Measurement
11
22
33
44
55
66
77
88
99
10
10
11
11
App
App
Index
Index
Comparing waveform data before the construction and after the construction
8.
Tap the
Work Trace Comparison
soft key, the
Trace Shift
soft key, and then the
Trace Shift
Right
soft key. The waveform data (captured waveform) before the construction moves to
the right side of the screen. Use
Trace Shift Right
or
Trace Shift Left
depending on the
differences in the start points before the construction and after the construction. In this example,
because the distance between the start point and the end point after the construction is long,
the waveform data before the construction is moved to the right side.
Waveform data after
construction
Waveform data before construction
(captured waveform)
Moved to
the right
By overlapping the waveform data before construction and
that after construction, you can check that there are no
changes in the events.
A
B
Explanation
When installed fibers are moved because of road construction or other external factors (rerouting
work), using this feature enables you to compare the event waveform before the construction to that
after the construction. This makes it easy to check the presence of obstacles caused as a result of the
rerouting work.
The markers of 4 Point Monitor are used to measure two sections as loss measurements for when the
optical fiber is switched. The measurement of the two sections is performed the marker pairs
A
and
B
and the marker pairs
C
and
D
.
Rerouting work
A
B
C
D
3.4 Rerouting Work