33
E
8. Check:
• Fully open position
Incorrect
→
Adjust.
9. Check:
• Throttle operation
Unsmooth operation
→
Adjust.
Checking steps:
• Turn the shift lever to the forward position.
• Turn the throttle grip fully open.
• Check that the throttle valve lever so that it
contacts the fully opened stopper.
Checking steps:
• Turn the shift lever to the neutral position.
• Fully open and close the throttle several
times.
• Check that the throttle valve fully opens
and closes.
10. Connect:
• Wiring harness coupler
1
11. Install:
• Plastic tie
1
NOTE:
Fasten the battery cable to the shift cable,
throttle cable and wiring harness.
TillerHandle.book Page 33 Friday, April 12, 2013 3:19 PM
Содержание 40
Страница 6: ......
Страница 8: ......
Страница 60: ...51 E 3 Install Cable stopper 1 Shift cable 2 Throttle cable 3 Bolt 4 Grommet 5 1 2 4 3 5...
Страница 224: ...Printed in Japan Mar 2013 0 9 2 CR E_1 F_1 S_1 Printed on recycled paper...