121
E
12. Adjust:
• Throttle cable joint position
13. Check:
• Throttle operation
Unsmooth operation
→
Adjust.
Adjustment steps:
• Turn the throttle grip to the fully closed
position.
• Contact the throttle control lever
1
to the
fully closed stopper
2
.
• Adjust the position of the throttle cable
joint until it aligns with the set pin.
WARNING
The throttle cable joint must be screwed
in at least 8.0 mm (0.31 in).
• Install the throttle cable joint
3
onto the
set pin
a
.
• Install the clip
4
and tighten the locknut
5
.
Checking steps:
• Turn the shift lever to the neutral position.
• Fully open and close the throttle several
times.
• Check that the throttle valve fully opens
and closes.
2
1
TillerHandle.book Page 121 Friday, April 12, 2013 3:19 PM
Содержание 40
Страница 6: ......
Страница 8: ......
Страница 60: ...51 E 3 Install Cable stopper 1 Shift cable 2 Throttle cable 3 Bolt 4 Grommet 5 1 2 4 3 5...
Страница 224: ...Printed in Japan Mar 2013 0 9 2 CR E_1 F_1 S_1 Printed on recycled paper...