151
E
3. Install:
• Cable stopper
1
• Shift cable
2
• Throttle cable
3
• Bolt
4
• Grommet
5
1
2
4
3
5
4. Adjust:
• Shift cable joint position
5. Check:
• Shift operation
Unsmooth operation
→
Adjust.
Adjustment steps:
• Set the shift lever
1
to the neutral posi-
tion.
• Align the center of the set pin
2
with the
mark
a
on the bracket.
• Adjust the position of the cable joint
3
until its hole aligns with the set pin.
• Install the clip
4
, and then tighten the
locknut
5
.
WARNING
The cable joint must be screwed in a
minimum of 8.0 mm (0.31 in).
Checking steps:
• Turn the throttle grip to the fully closed
position.
• Check the shift lever for smooth operation
by shifting the lever from neutral to forward
and reverse.
a
2
8.0 mm (0.31 in)
4
3
5
TillerHandle.book Page 151 Friday, April 12, 2013 3:19 PM
Содержание 40
Страница 6: ......
Страница 8: ......
Страница 60: ...51 E 3 Install Cable stopper 1 Shift cable 2 Throttle cable 3 Bolt 4 Grommet 5 1 2 4 3 5...
Страница 224: ...Printed in Japan Mar 2013 0 9 2 CR E_1 F_1 S_1 Printed on recycled paper...