
XO FLOW – Installation instructions
42
Figure 55 – Mounting the two ferrite cores onto cable CA-947 BRIDGE POWER and CA-987 Navigator
communication cable
5.9
Fitting the operating light
5.9.1
Unpacking the operating light
The operating light is delivered pre-assembled in the box with the Navigator.
Figure 56 – Operating light arm
5.9.2
Ceiling height less than 255 cm
In case the ceiling height is 255 cm or more the outer cylinder of the light is to be fitted in the manner
described above.
If the ceiling height is in the range 230 – 255 cm, however, the outer cylinder and the light arm post
will need to be fitted simultaneously. The outer cylinder may be raised, tilted and supported on top of
the lower plastic guide ring while the light arm post is fitted and fastened.
5.9.3
Fitting the light arm
The easiest way to fit the light arm is to start by fitting the arm and then routing the cables down
through the light arm post.
1.
Lower the light arm carefully onto the light arm post – be careful not to tilt the arm and squeeze the
bearings. See Figure 57.
2.
Route the cables through the light arm post and pull them from the hole of the electronics side of
the unit stand. If necessary, use a piece of hard wire as a “search spring”.
Содержание FLOW
Страница 1: ...XO FLOW INSTALLATION INSTRUCTIONS...
Страница 2: ...2...
Страница 5: ...XO FLOW Installation instructions 5 10 One month follow up 71 11 Fuses 72 12 Symbols 72...
Страница 17: ...XO FLOW Installation instructions 17 Figure 15 Lifting the unit stand Figure 16 Adjusting the unit base...
Страница 35: ...XO FLOW Installation instructions 35 Figure 43 Fitting of lower outer cylinder...
Страница 38: ...XO FLOW Installation instructions 38 Figure 48 Positioning of the cables Figure 49 Securing the cables...
Страница 44: ...XO FLOW Installation instructions 44 Figure 58 Fitting the brake Figure 59 Fitting the cover plug...