
XO FLOW – Installation instructions
13
Open the boxes and check that the goods delivered correspond to the goods ordered. Then start to
unpack the unit stand. If possible, leave the other components in the boxes until you need them.
The unit stand must only be lifted at its base using the carrying handles.
Never lift the unit stand at its top or in other ways!
5
INSTALLATION
5.1
Installation kit
Figure 10 – Installation kit (AR-135)
The included installation kit contains all necessary components for the installation – both for
installation on concrete floor, wooden floor or on a steel installation plate.
5.2
Installation of the unit stand
Make sure to place the unit stand correctly in the operatory. See Figure 1.
Prior to drilling holes in the floor, be sure that the supplies and connections have been laid
out correctly in accordance with the requirements mentioned in section 2.
Содержание FLOW
Страница 1: ...XO FLOW INSTALLATION INSTRUCTIONS...
Страница 2: ...2...
Страница 5: ...XO FLOW Installation instructions 5 10 One month follow up 71 11 Fuses 72 12 Symbols 72...
Страница 17: ...XO FLOW Installation instructions 17 Figure 15 Lifting the unit stand Figure 16 Adjusting the unit base...
Страница 35: ...XO FLOW Installation instructions 35 Figure 43 Fitting of lower outer cylinder...
Страница 38: ...XO FLOW Installation instructions 38 Figure 48 Positioning of the cables Figure 49 Securing the cables...
Страница 44: ...XO FLOW Installation instructions 44 Figure 58 Fitting the brake Figure 59 Fitting the cover plug...