Supervision
•In addition, the User can also select
none
(e.g.: if the User intends to use one of the three additional assignable
trigger inputs).
Those trips can exclusively start the breaker failures that are assigned
within the trip manager to the breaker that is to be supervised. In contrast
to that the additional three triggers 1-3 will trigger the
CBF
module even if
they are not assigned onto the breaker within the corresponding breaker
manager.
Select the winding side (Breaker, Winding) from which the measured
currents should be taken in case this protective device provides more than
one current measurement card.
This Notice applies to protective devices that offer control functionality
only! This protective element requires, that a switchgear (circuit breaker) is
assigned to it. It is allowed only to assign switchgears (circuit breaker) to
this protective element, whose measuring transformers provide measuring
data to the protective device.
Breaker Failure Lockout
The signal of the Circuit Breaker Failure is latched. This signal can be used to block the breaker against a switching
on attempt.
560
MRI4
DOK-HB-MRI4-2E
Содержание highprotec MRI4
Страница 1: ...Manual Feeder Protection MRI4 Software Version 3 4 a DOK HB MRI4 2E Revision C English...
Страница 43: ...Installation and Connection 43 MRI4 DOK HB MRI4 2E...
Страница 46: ...Installation and Connection Ensure the correct tightening torques 46 MRI4 DOK HB MRI4 2E...
Страница 56: ...Installation and Connection Ethernet RJ45 Terminals 56 MRI4 DOK HB MRI4 2E 1 8 TxD TxD RxD n c n c RxD n c n c...
Страница 69: ...Navigation Operation Navigation Operation 69 MRI4 DOK HB MRI4 2E 1 2 3 5 7 6 8 10 9...
Страница 353: ...Device Parameters 353 MRI4 DOK HB MRI4 2E...
Страница 373: ...373 MRI4 DOK HB MRI4 2E...