12 BREAKER OPEN TIME (SEC):
[*1 (0.8,60)] This menu item defines the generator breaker open time
when an unload command is given and the breaker opening conditions are fulfilled.
13 RAMP @ MIN, CB DELAY (SEC):
[*5 (1,10)] This menu item defines the maximum delay between the
load reference reaching the unload trip level and the generator breaker open command. If the generator
load reaches the unload trip level load before this time expires the breaker open command is given
sooner.
33 BSLD CTRL (PID & MONITOR)
This menu is used to configure the baseload controller.
01 BASELOAD REFERENCE (kW):
[MONITOR]
02 GENERATOR LOAD (kW):
[MONITOR]
03 BASELOAD REFERENCE (%):
[MONITOR]
04 GENERATOR LOAD (%):
[MONITOR]
05 BASELOAD PID OUTPUT (%):
[MONITOR]
06 BSLD PROPORTIONAL GAIN :
[*0.7 (0,100)] This parameter defines the proportional gain of the
baseload controller PID.
07 BSLD INTEGRAL GAIN :
[*0.2 (0,100)] This parameter defines the integral gain of the baseload
controller PID.
08 BASELOAD SPEED RAMP RATE:
[*0.2 (0.001,100)] This menu item defines the rate at which the
baseload speed reference is passed to the on-line speed ramp.
34 OVERSPEED TEST
This menu is used to configure and command the overspeed test.
01 OVERSPEED TEST ENABLED:
[MONITOR]
02 ACTUAL SPEED:
[MONITOR]
03 MAX SPEED REACHED:
[MONITOR]
04 RESET MAX SPEED
: [TRUE or *FALSE] This menu item will reset the
item (MAXIMUM SPEED REACHED) when it is tuned from FALSE to
TRUE.
05 OST REMMAINING TIME:
[MONITOR] This is the remaining time to the overspeed test be disabled
automatically, if the test is not completed or forgotten for the operator.
06 TURBINE RUNNING (PERMISSIVE 1):
[MONITOR] There are some permissives to allow the user to
enable the overspeed test. This is one of these permissives (the turbine should be running).
07 UNIT OFFLINE (PERMISSIVE 2):
[MONITOR] There are some permissives to allow the user to
enable the overspeed test. This is one of these permissives (the unit should be offline).
08 SPEED > 95% (PERMISSIVE 3):
[MONITOR] There are some permissives to allow the user to enable
the overspeed test. This is one of these permissives (the speed should be greater then 95% of the rated
speed).
09 OVERSPEED TEST LIMIT:
[*200.0 (75.0, 250.0)] This is the maximum value that the user can raise
the speed reference while the overspeed test is enabled.
10 OVERSPEED TEST MAXIMUM TIME:
[*1800.0 (1.0, 7200.0)] This is the maximum time that the
control will wait until the test is finished. If the test is not finished before this time expires the test will be
automatically disabled.
11 ENABLE OVERSPEED TEST:
[TRUE or *FALSE] Set this parameter to true to start the overspeed
test.
Released
Содержание 2301E-HT
Страница 34: ...Manual 35092 2301E HT Hydro Francis Turbines Woodward 32 Figure 3 7b Control diagram 2 of 2 Released ...
Страница 82: ...Manual 35092 2301E HT Hydro Francis Turbines Woodward 80 Declarations Released ...
Страница 83: ...Manual 35092 2301E HT Hydro Francis Turbines Woodward 81 Released ...