![WinGD X82-B Скачать руководство пользователя страница 840](http://html1.mh-extra.com/html/wingd/x82-b/x82-b_maintenance-manual_986581840.webp)
C
o
p
y
ri
g
h
t
W
in
te
rt
h
u
r
G
a
s
&
D
ie
s
e
l
L
td
.
A
ll
r
ig
h
ts
r
e
s
e
rv
e
d
.
B
y
t
a
k
in
g
p
o
s
s
e
s
s
io
n
o
f
th
e
d
ra
w
in
g
,
th
e
r
e
c
ip
ie
n
t
re
c
o
g
n
iz
e
s
a
n
d
h
o
n
o
rs
t
h
e
s
e
r
ig
h
ts
.
N
e
it
h
e
r
th
e
w
h
o
le
n
o
r
a
n
y
p
a
rt
o
f
th
is
d
ra
w
in
g
m
a
y
b
e
u
s
e
d
i
n
a
n
y
w
a
y
f
o
r
c
o
n
s
tr
u
c
ti
o
n
,
fa
b
ri
c
a
ti
o
n
,
m
a
rk
e
ti
n
g
o
r
a
n
y
o
th
e
r
p
u
rp
o
s
e
n
o
r
c
o
p
ie
d
in
a
n
y
w
a
y
n
o
r
m
a
d
e
a
c
c
e
s
s
ib
le
t
o
t
h
ir
d
p
a
rt
ie
s
w
it
h
o
u
t
th
e
p
re
v
io
u
s
w
ri
tt
e
n
c
o
n
s
e
n
t
o
f
W
in
te
rt
h
u
r
G
a
s
&
D
ie
s
e
l
L
td
.
Component
Work to be carried out
Intervals & Lifetime
[operating hours]
Remove water separator for general overhaul
as necessary
Lubricating pump (Group 72xx)
Checking gas (nitrogen) pre-charge pressure, directly after installation of a
new accumulator then at least one week after start-up
every three month
Remanufacturing
40000
Cylinder lube oil filter
Replace filter element before the cylinder lubricating system
as necessary
Exhaust waste gate (LLT, group
81xx)
General Inspection. During a longer operation period at low engine load,
manually open the butterfly valve (refer to Operation Manual 8135-1)
in accordance with instructions
of valve manufacturer
SCR butterfly valves (HP-SCR,
group 81xx)
Test of the function of the SCR butterfly valves during engine standstill by
use of the function “SCR Manual Valve Control”.
Regularly during engine
standstill. In accordance with
instructions of valve
manufacturer.
Servo oil service pump (engine
mounted)
Check rate of flow and max. pressure
30000
Servo oil automatic filter
check and clean the filter cartridges
acc. to manufacturer
Starting air pipes on and before
the engine
Drain (remove water)
before and after every
manoeuvring period
Pressure gauges and pyrometers
Compare and calibrate according to master instruments
6000 - 8000
Pipe holders (Group 8xxx)
Check fastenings at intervals if necessary, tighten the screws (first time
after 100 Op. h.)
as necessary
Servo oil pipes (Group 84xx)
Grind sealing faces
as necessary
Non-return valve (fuel inlet at fuel
rail)
Random check
18000
Hydraulic pipe for exhaust valve
drive (Group 8460)
Grind sealing faces
as necessary
HP pipe to injection valve (on
cylinder cover, group 87xx)
Grind sealing faces
as necessary
Supply unit fuel drain pipes
(Group 87xx)
Make sure that the pipes are not blocked
6000
HP fuel pipe (Group 87xx)
Grind sealing faces
as necessary
Crank angle sensor (at free end)
Check belt tension visually, check cracks and wear of toothed belt visually,
visual lubricating oil check
3000
replace toothed belt
24000
Overhaul drive (ball bearing, sealing ring etc.) and check shaft eccentricity
of CAS drive
48000
Check shaft eccentricity of CAS drive
at every CAS exchange
Replace crank angle sensor (only if new soft belt is applied from
beginning).
48000
Crank angle sensor (on gear
wheel)
Replace the proximity sensor
as necessary
Cylinder cover - Relief valve
Do a check of the blow-off pressure
as necessary
Oil mist detector (Group 93xx)
Follow manufacturer’s instructions
half yearly
WECS-9520 electronic
components
Replace FCM-20, ALM-20, ACM-20 modules (refer to the Operation
Manual, Group 4)
66000
Replace exhaust valve stroke sensor and TDC sensors if defective
66000 (replacement if
required)
Do a visual check of the cables; Replace damages cables and wires
quarterly
Maintenance Intervals /
Lifetime
Rev. D
Page 5 / 6
Содержание X82-B
Страница 10: ...X82 B Maintenance Manual Page left intentionally blank Winterthur Gas Diesel Ltd 10 Issue 001 2020 10...
Страница 199: ...X82 B Maintenance Manual Page left intentionally blank Winterthur Gas Diesel Ltd 199 Issue 001 2020 10...
Страница 335: ...X82 B Maintenance Manual Page left intentionally blank Winterthur Gas Diesel Ltd 335 Issue 001 2020 10...
Страница 825: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 1 9...
Страница 826: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 2 9...
Страница 827: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 3 9...
Страница 828: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 4 9...
Страница 829: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 5 9...
Страница 830: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 6 9...
Страница 831: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 7 9...
Страница 832: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 8 9...
Страница 833: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 9 9...