![WinGD X82-B Скачать руководство пользователя страница 400](http://html1.mh-extra.com/html/wingd/x82-b/x82-b_maintenance-manual_986581400.webp)
8.5.6
Connecting rod - examine the bearing shells
Periodicity
Description
Working hours
70000
Duration for performing preliminary requirements
0.0 man-hours
Duration for performing the procedure
0.5 man-hours
Duration for performing the requirements after job completion
0.0 man-hours
Personnel
Description
Specialization
QTY
Engine crew
Basic
AR
Support equipment
Description
Part No.
CSN
QTY
None
Supplies
Description
QTY
None
Spare Parts
Description
Part No.
CSN
QTY
None
SAFETY PRECAUTIONS
•
None
PRELIMINARY OPERATIONS
•
Do the procedures given in section
8.5.4 Connecting rod - remove the top end bearing
X82-B
AA00-3303-05AAA-310A-A
Maintenance Manual
Connecting rod - examine the bearing shells
Winterthur Gas & Diesel Ltd.
- 400 -
Issue 001 2020-10
Содержание X82-B
Страница 10: ...X82 B Maintenance Manual Page left intentionally blank Winterthur Gas Diesel Ltd 10 Issue 001 2020 10...
Страница 199: ...X82 B Maintenance Manual Page left intentionally blank Winterthur Gas Diesel Ltd 199 Issue 001 2020 10...
Страница 335: ...X82 B Maintenance Manual Page left intentionally blank Winterthur Gas Diesel Ltd 335 Issue 001 2020 10...
Страница 825: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 1 9...
Страница 826: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 2 9...
Страница 827: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 3 9...
Страница 828: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 4 9...
Страница 829: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 5 9...
Страница 830: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 6 9...
Страница 831: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 7 9...
Страница 832: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 8 9...
Страница 833: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 9 9...