![WinGD X82-B Скачать руководство пользователя страница 190](http://html1.mh-extra.com/html/wingd/x82-b/x82-b_maintenance-manual_986581190.webp)
6.8
Tie rod
6.8.1
Tie rod - do a check of the pre-tension
Periodicity
Description
Working hours
27 000
Duration for performing preliminary requirements
0.0 man-hours
Duration for performing the procedure
1.0 man-hours
Duration for performing the requirements after job completion
0.0 man-hours
Personnel
Description
Specialization
QTY
Engine crew
Basic
AR
Support equipment
Description
Part No.
CSN
QTY
Pre-tensioning jacks
94180
2
Feeler gauge
94122
1
Supplies
Description
QTY
Molykote paste G
A/R
Spare Parts
Description
Part No.
CSN
QTY
None
SAFETY PRECAUTIONS
•
None
PRELIMINARY OPERATIONS
•
The engine must be stopped and made safe for maintenance, refer to section
maintenance work - general procedure
X82-B
AA00-1903-00AAA-360A-A
Maintenance Manual
Tie rod - do a check of the pre-tension
Winterthur Gas & Diesel Ltd.
- 190 -
Issue 001 2020-10
Содержание X82-B
Страница 10: ...X82 B Maintenance Manual Page left intentionally blank Winterthur Gas Diesel Ltd 10 Issue 001 2020 10...
Страница 199: ...X82 B Maintenance Manual Page left intentionally blank Winterthur Gas Diesel Ltd 199 Issue 001 2020 10...
Страница 335: ...X82 B Maintenance Manual Page left intentionally blank Winterthur Gas Diesel Ltd 335 Issue 001 2020 10...
Страница 825: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 1 9...
Страница 826: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 2 9...
Страница 827: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 3 9...
Страница 828: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 4 9...
Страница 829: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 5 9...
Страница 830: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 6 9...
Страница 831: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 7 9...
Страница 832: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 8 9...
Страница 833: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 9 9...