PROCEDURE
1
Prepare the top end bearing of the connecting rod for removal.
1.1
Operate the turning gear to turn the crank to BDC.
1.2
Remove the round nuts (001,
), refer to section
1.3
Operate the turning gear to turn the crank to TDC.
1.4
Put oil on the threads of the four bolts (004).
1.5
Attach the two holders (003) to the piston rod foot (005) with the four bolts (004).
1.6
Torque the four bolts (004) to the correct value, refer to section
1.7
Tighten the two bolts (002).
1.8
Operate the turning gear to move the crank to BDC.
1.9
Lock the turning gear to prevent movement of the crankshaft.
Fig 8-42
Preparation
1.10
Make sure that the platform (001,
1.11
Install the deviation pipe (002) to the column.
X82-B
AA00-3303-01AAA-520A-A
Maintenance Manual
Connecting rod - remove the top end bearing cover
Winterthur Gas & Diesel Ltd.
- 420 -
Issue 001 2020-10
Содержание X82-B
Страница 10: ...X82 B Maintenance Manual Page left intentionally blank Winterthur Gas Diesel Ltd 10 Issue 001 2020 10...
Страница 199: ...X82 B Maintenance Manual Page left intentionally blank Winterthur Gas Diesel Ltd 199 Issue 001 2020 10...
Страница 335: ...X82 B Maintenance Manual Page left intentionally blank Winterthur Gas Diesel Ltd 335 Issue 001 2020 10...
Страница 825: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 1 9...
Страница 826: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 2 9...
Страница 827: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 3 9...
Страница 828: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 4 9...
Страница 829: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 5 9...
Страница 830: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 6 9...
Страница 831: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 7 9...
Страница 832: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 8 9...
Страница 833: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 9 9...