![WinGD X82-B Скачать руководство пользователя страница 304](http://html1.mh-extra.com/html/wingd/x82-b/x82-b_maintenance-manual_986581304.webp)
7.7.2
Exhaust valve - disassemble
Periodicity
Description
One Time - after first working hours
18 000
Working hours
36 000
Duration for performing preliminary requirements
0.0 man-hours
Duration for performing the procedure
1.0 man-hours
Duration for performing the requirements after job completion
0.0 man-hours
Support equipment
Description
Part No.
CSN
QTY
Jack screws
94263
2
Depth gauge
94126
1
Eye bolts
94045-M12
2
Eye bolts
94045-M24
2
Chain
94019B
1
Supplies
Description
QTY
None
Spare Parts
Description
Part No.
CSN
QTY
None
SAFETY PRECAUTIONS
CAUTION
During this procedure, do the work in a clean area. Electrical welding is not permitted.
Injury to personnel can occur.
PRELIMINARY OPERATIONS
•
The exhaust valve must be removed, refer to section
X82-B
AA00-2751-00AAA-530A-A
Maintenance Manual
Exhaust valve - disassemble
Winterthur Gas & Diesel Ltd.
- 304 -
Issue 001 2020-10
Содержание X82-B
Страница 10: ...X82 B Maintenance Manual Page left intentionally blank Winterthur Gas Diesel Ltd 10 Issue 001 2020 10...
Страница 199: ...X82 B Maintenance Manual Page left intentionally blank Winterthur Gas Diesel Ltd 199 Issue 001 2020 10...
Страница 335: ...X82 B Maintenance Manual Page left intentionally blank Winterthur Gas Diesel Ltd 335 Issue 001 2020 10...
Страница 825: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 1 9...
Страница 826: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 2 9...
Страница 827: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 3 9...
Страница 828: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 4 9...
Страница 829: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 5 9...
Страница 830: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 6 9...
Страница 831: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 7 9...
Страница 832: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 8 9...
Страница 833: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 9 9...