![WinGD X82-B Скачать руководство пользователя страница 202](http://html1.mh-extra.com/html/wingd/x82-b/x82-b_maintenance-manual_986581202.webp)
PROCEDURE
1
Operate the turning gear to move the piston to BDC.
2
Lock the lever of the cooling water valve in the closed position.
3
) in position in the cylinder liner (004).
X82-B
AA00-2124-00AAA-360A-A
Maintenance Manual
Cylinder liner - do a check of the bore
Winterthur Gas & Diesel Ltd.
- 202 -
Issue 001 2020-10
Содержание X82-B
Страница 10: ...X82 B Maintenance Manual Page left intentionally blank Winterthur Gas Diesel Ltd 10 Issue 001 2020 10...
Страница 199: ...X82 B Maintenance Manual Page left intentionally blank Winterthur Gas Diesel Ltd 199 Issue 001 2020 10...
Страница 335: ...X82 B Maintenance Manual Page left intentionally blank Winterthur Gas Diesel Ltd 335 Issue 001 2020 10...
Страница 825: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 1 9...
Страница 826: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 2 9...
Страница 827: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 3 9...
Страница 828: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 4 9...
Страница 829: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 5 9...
Страница 830: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 6 9...
Страница 831: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 7 9...
Страница 832: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 8 9...
Страница 833: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 9 9...