10.2.4
Fuel pump - install
Periodicity
Description
Working hours
20 000
Duration for performing preliminary requirements
0.0 man-hours
Duration for performing the procedure
1.0 man-hours
Duration for performing the requirements after job completion
0.0 man-hours
Support equipment
Description
Part No.
CSN
QTY
Cover
94552
pc 1
Supplies
Description
QTY
Oil
A/R
Molykote paste G
A/R
Penetrating oil, for example WD-40
A/R
Spare Parts
Description
Part No.
CSN
QTY
Fuel pump
A/R
O-rings
3
SAFETY PRECAUTIONS
WARNING
Injury Hazard: Before you operate the turning gear, make sure that no personnel are near
the flywheel, or in the engine.
PRELIMINARY OPERATIONS
•
None
X82-B
AA00-5556-00AAA-720A-A
Maintenance Manual
Fuel pump - install
Winterthur Gas & Diesel Ltd.
- 558 -
Issue 001 2020-10
Содержание X82-B
Страница 10: ...X82 B Maintenance Manual Page left intentionally blank Winterthur Gas Diesel Ltd 10 Issue 001 2020 10...
Страница 199: ...X82 B Maintenance Manual Page left intentionally blank Winterthur Gas Diesel Ltd 199 Issue 001 2020 10...
Страница 335: ...X82 B Maintenance Manual Page left intentionally blank Winterthur Gas Diesel Ltd 335 Issue 001 2020 10...
Страница 825: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 1 9...
Страница 826: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 2 9...
Страница 827: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 3 9...
Страница 828: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 4 9...
Страница 829: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 5 9...
Страница 830: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 6 9...
Страница 831: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 7 9...
Страница 832: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 8 9...
Страница 833: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 9 9...