1-2
The blower is on during the heating cycle. The blower also turns on if the oil temperature exceeds 2°F above
setpoint and during filtration to help cool the frypot to minimize caramelization of the oil on the frypot
interior.
1.3 Interface
Board
All fryers in this series have an interface
board
located in the component box behind the control panel. The
interface board provides a link between the controller and the fryer’s individual components without requiring
excessive wiring, and allows the controller to execute commands from one central point.
K2 and K3 are double-pole-double throw (DPDT) relays that supply 24VAC to the ignition and gas valve
circuits, as well as 120VAC to the blower motor. The relays on this board plug into sockets. If a relay fails,
that relay can be replaced. K1 and K4 are single-pole-double throw (SPDT) relays that supply voltage to the
basket lifts.
LEDs (labeled D1 through D7) are arrayed around the board to assist in troubleshooting.
K4
K1
SOUND
GND
V2D
PWR
AD
AS
V2S
GND
GV
PWR
12V
AIR
24V
PWR
GND
V1D
PWR
ALR
V1S
GV
GND
J2
SMT INTERFACE BOARD KIT 826-2264 (106-6706)
J3
3
6
9
12
2
5
8
11
1
4
7
10
J1
3
6
9
12
2
5
8
11
1
4
7
10
15
12
9
6
3
14
11
8
5
2
13
10
7
4
1
K2
K3
HEAT
RELAY
AND
BLOWER
MOTOR
RELAY
D1
D2
D3
D4
D6
D7
D5
HEAT
RELAY
AND
BLOWER
MOTOR
RELAY
F2 Ignition
3 AMP Module
J6
J7
J8
GND
GND
1
2
3
F1
Blower
Motor
3 AMP
LEFT
BASKET
LIFT
RELAY
RIGHT
BASKET
LIFT
RELAY
D1
24 VAC to left gas valve (dual vat only)
D2
24 VAC to left ignition module
D3
24 VAC from transformer
D4
24 VAC to right ignition module
D5
24 VAC to gas valve (right valve if dual vat)
D6
12 VAC from transformer
D7
CE and Japanese units only: air switch closed
INTERFACE BOARD
LED DIAGNOSTIC LIGHTS
NOTE
: In full-vat fryers, the relay for the left side (K2) may not be present.
The chart on the following page illustrates current flow through the board, and the table at the top of page 1-4
identifies frequently used test points.
NOTE: Refer to Section 1.11.1 on
page 1-20 for troubleshooting
flowchart.
Содержание Frymaster FilterQuick 2FQG30U
Страница 8: ...1 3 ...
Страница 41: ...1 36 1 16 2 Bulk Wiring ...
Страница 56: ...1 51 1 18 6 Clogged Drain Failed Oil Sensor Error Flowchart ...
Страница 57: ...1 52 1 18 7 Menu Trees 1 18 7 1 FilterQuick Controller Setup Menu Tree ...
Страница 58: ...1 53 1 18 7 2 FilterQuick Filter and Info Mode Menu Tree ...
Страница 62: ...1 57 1 20 Principal Wiring Connections ...
Страница 63: ...1 58 1 21 Wiring Diagrams 1 21 1 Main FQG 230 430 120V CE Export ...
Страница 64: ...1 59 1 21 2 Main FQG 230 430 Australia ...
Страница 65: ...1 60 1 21 3 Main FQG 230 430 120V CE Export with Solid Shortening ...
Страница 66: ...1 61 1 21 4 Main FQG 230 430 Australia with Solid Shortening ...
Страница 67: ...1 62 1 21 5 Main FQG 330 530 120V CE Export ...
Страница 68: ...1 63 1 21 6 Main FQG 330 530 Australia ...
Страница 69: ...1 64 1 21 7 Main FQG 330 530 120V CE Export with Solid Shortening ...
Страница 70: ...1 65 1 21 8 Main FQG 330 530 Australia with Solid Shortening ...
Страница 71: ...1 66 1 21 9 Transformer Filter Box 430 530 ...
Страница 72: ...1 67 1 22 Simplified Wiring Diagrams 1 22 1 FilterQuick FQG30 Series Simplified Wiring with Push Pull Handles ...
Страница 73: ...1 68 1 22 2 FilterQuick FQG30 Series Simplified Wiring with Push Buttons ...
Страница 74: ...1 69 1 22 3 FilterQuick FQG30 Series Data Network Flowchart ...
Страница 76: ...1 71 1 24 Shortening Melting Unit Wiring Diagram ...
Страница 77: ...1 72 1 25 Modular Basket Lift Wiring Diagram 100 120V 1 2 4 3 5 6 12 7 8050518E ...
Страница 79: ...1 74 1 27 Basket Lift Interface Harness ...