1-10
5.
Reinstall the blower assembly in the fryer and reconnect the wiring disconnected in Step 1.
6.
Light the fryer in accordance with the procedure described in Chapter 3, Section 3.1.2 of the FilterQuick™
FQG30 Series Gas Fryer Installation and Operation Manual (P/N 819-6286).
7.
After the burners have been lit for at least 90 seconds, observe the flames through the burner viewing ports
located on each side of the combustion air blower.
The air/gas mixture is properly adjusted when the burner manifold pressure is in accordance with the
applicable table on page 1-5 and the burners display a bright orange-red glow. If a blue flame is observed
or if there are dark spots on a burner face, the air/gas mixture requires adjustment.
NOTE: Opening the air shutter too much may result in whistling. It should not be more
than 1/3 open.
1.9.7 Adjusting the Air/Gas Mixture
On the side of the blower housing opposite the motor is a shutter plate with a locking nut. Loosen the nut
enough to allow the shutter to be moved, then adjust the position of the shutter to open or close the air intake
opening until a bright orange-red glow is obtained, then close it slightly. Carefully hold the shutter in position
and tighten the locking nut (see illustration on the following page).
1.9.8 Replacing a Gas Valve
1.
Disconnect fryer from electrical and gas supplies.
2.
Disconnect the drain safety and high-limit thermostat wires from the gas valve. Mark each wire to facilitate
reconnection.
3.
Remove the vent tube (on non-CE fryers) and the enrichment tube fitting from the valve. Disconnect the
flexible gas line(s).
If replacing the left-most valve on any configuration, or the right valve on a two-fryer battery, follow the
instructions below. If replacing valves in other positions, skip to “
ALL OTHER VALVES
.”
A.
Remove the filter pan from the unit. Remove the door adjacent to the valve being replaced.
B.
Remove the screws on that attach the pan rails adjacent to the valve being replaced.
Right
Viewing Port is
behind motor.
Left Viewing
Port.
On non-CE blowers loosen
this nut and rotate shutter
to open or close air intake.
On CE blowers loosen both
wing nuts and slide the
shutter to adjust the air
intake.
Содержание Frymaster FilterQuick 2FQG30U
Страница 8: ...1 3 ...
Страница 41: ...1 36 1 16 2 Bulk Wiring ...
Страница 56: ...1 51 1 18 6 Clogged Drain Failed Oil Sensor Error Flowchart ...
Страница 57: ...1 52 1 18 7 Menu Trees 1 18 7 1 FilterQuick Controller Setup Menu Tree ...
Страница 58: ...1 53 1 18 7 2 FilterQuick Filter and Info Mode Menu Tree ...
Страница 62: ...1 57 1 20 Principal Wiring Connections ...
Страница 63: ...1 58 1 21 Wiring Diagrams 1 21 1 Main FQG 230 430 120V CE Export ...
Страница 64: ...1 59 1 21 2 Main FQG 230 430 Australia ...
Страница 65: ...1 60 1 21 3 Main FQG 230 430 120V CE Export with Solid Shortening ...
Страница 66: ...1 61 1 21 4 Main FQG 230 430 Australia with Solid Shortening ...
Страница 67: ...1 62 1 21 5 Main FQG 330 530 120V CE Export ...
Страница 68: ...1 63 1 21 6 Main FQG 330 530 Australia ...
Страница 69: ...1 64 1 21 7 Main FQG 330 530 120V CE Export with Solid Shortening ...
Страница 70: ...1 65 1 21 8 Main FQG 330 530 Australia with Solid Shortening ...
Страница 71: ...1 66 1 21 9 Transformer Filter Box 430 530 ...
Страница 72: ...1 67 1 22 Simplified Wiring Diagrams 1 22 1 FilterQuick FQG30 Series Simplified Wiring with Push Pull Handles ...
Страница 73: ...1 68 1 22 2 FilterQuick FQG30 Series Simplified Wiring with Push Buttons ...
Страница 74: ...1 69 1 22 3 FilterQuick FQG30 Series Data Network Flowchart ...
Страница 76: ...1 71 1 24 Shortening Melting Unit Wiring Diagram ...
Страница 77: ...1 72 1 25 Modular Basket Lift Wiring Diagram 100 120V 1 2 4 3 5 6 12 7 8050518E ...
Страница 79: ...1 74 1 27 Basket Lift Interface Harness ...