ASSEMBLE MAIN RAIL PER FIELD DRAWINGS
PEDESTAL
BASE
PEDESTAL
RAIL PIN
21" +/- 1/32"
MEASURE DISTANCE
& DIVIDE BY 2
A
D
MOUNTING
BOLTS
RAIL SEC
TION
LEVEL
LEVEL
2.
3.
4.
11.
1.
5.
7.
6.
8.
9.
10.
12.
13.
14.
VERIFY ALL FASTENERS ARE SECURELY FASTENED
2, 3
5
7
14
4
3
3
RAIL AND PEDESTAL
INSTALLATION
SERIES :
116
Use fi eld drawings to determine where to center the rail on the
hoistway wall and mark a centerline.
Mark plumb line 16 5/8” over to the left or right of the
centerline.
Distance Between Guides (DBG) should be 21” apart inside
to inside.
Measure corner to corner on each section of rail
to determine if rail section is square. Loosen mounting bolts
and adjustment as necessary to ensure rail section is square.
Torque 1/2” rail fasteners to 85 ft. lbs.
Verify the rail ends are
not off set at the top and bottom of each rail section.
Set pedestal base into place on the pit fl oor.
Align fi rst section of rail with plumb line in the hoistway. Drill
(2) appropriately sized pilot holes centered in each slot per rail
bracket. Loosely fasten with architect specifi ed hardware.
To allow for the next rail section to be installed, loosen rail clip
bolts.
Insert rail pins into predrilled holes on the top installed rail
section. Align rail with the predrilled holes on the bottom of the
next rail section and carefully lower into place.
Drill (2) appropriately sized pilot holes centered in each slot per
rail bracket. Loosely fasten into place with architect specifi ed
hardware. Finish fastening rail clips from step 6. Verify rail is
plumb and level.
Torque rail clip hardware bolts to 85 ft-lbs.
Continue rail installation following the steps 6 & 7 until the rail
is completely installed.
Verify the rail install is complete and plumb. Adjust and shim if
needed. Securely fasten rail to rail backing.
Refer to fi eld drawings for pedestal and jack locations and
install both brackets in appropriate locations using a plumb line
and loosely fasten with architect specifi ed hardware.
Align jack and pedestal brackets with rail brackets. Shim as
required to match rail brackets and securely fasten hardware.
Set pedestal into pedestal base.
Hand tighten pedestal to pedestal bracket with the
following provided hardware:
(2) - 3/8”-16 x 4-1/2” Bolts (1) - Clamping Plate
(4) - 3/8” Flat Washers
(2) - 3/8” Lock Washers
(2) - 3/8”-16 Nuts
Plumb pedestal and securely fasten.
Note:
Do not over tighten, or the plate may bend and
interfere with the sling.
Page 11
Содержание Paca-Ryde
Страница 2: ......
Страница 45: ...PAGE INTENTIONALLY LEFT BLANK ...
Страница 71: ......
Страница 72: ...PMI116 S APR 2018 1726 North Ballard Road Suite 1 Appleton WI 54911 Phone 920 991 9082 www waupacaelevator com ...