110 Appendix
WAGO I/O System 750 XTR
750-495/040-010 3-Phase POM 20KV 300A XTR
Manual
Version 1.0.0
Table 27: CSV File “Snapshot”
I/O-Check 3-Phase Power Measurement
Parameters, Phase L3
Overvoltage limit
2100 V
Overcurrent limit
5000 A
Interval observation:
arithm. mean calculation
60 s
Interval observation: peak value
measurement
10 half-waves
Take current transformer ratio into
account
False
Automatic reset of the min./max. values False
Current transformer ratio
0
Undervoltage limit
0 V
Interval – reset: min./max. values
2000 ms