
03TA Service Manual
MAINTENANCE
3/31/14
7-10
Note To Manager or Owner:
This page is a complete Preventive Maintenance Schedule that should be performed each 90 days.
The Preventive Maintenance page may be copied and given to your service person. It should be
signed, dated, and returned to you for permanent record.
Preventive Maintenance Program
This form can be removed and duplicated for keeping accurate records.
Model # ___________________
Serial # ____________________
Date _____________
Customer/Address ___________________________________________________________
____________________________________________________________
Mgr. Name ______________________ Service Tech Name __________________________
The following service performed and checked:
_____ Last maintenance performed (approx. date)
_____ Scale condition of water tank & tubes (good - fair - poor)
_____ All drains freely draining (water tank, drip pan, ice bin)
_____ Water distributors cleaned
_____ Ice machine cleaner circulated through system
_____ Condenser clean (if applicable)
_____ Voltage at machine (actual reading) ________, ________, ________
_____ Compressor amps (halfway through the freeze cycle) ________, ________, ________
_____ Cutter motor amps (cutting ice) ________, ________, ________
_____ Water pump amps ________, ________, ________
_____ AC condenser motor amps (if applicable) ________, ________, ________
_____ Crankcase heater heating
_____ Refrigerant leak (okay - high - low)
_____ Leak checked system ______ leaks found & repaired
_____ Compressor oil level (i.e., 1/4 - 1/2 - 3/4 - low - high)
_____ Gear reducer oil (okay - low)
_____ PSIG, low pressure switch set @
_____ PSIG, high pressure switch set @
_____ Bin stat(s) installed and operating properly
_____ Make-up water float valve adjusted okay
_____ Adjustable blowdown adjusted for clear ice
CYL__________
CRU________
Suction PSIG at end of freeze
CYL_____/____
CRU____/____
Suction PSIG during harvest (high/low)
CYL__________
CRU________
Discharge PSIG at end of freeze
______
°
F/
°
C at machine
______
°
F/
°
C outside ambient (at condenser if applicable)
______
°
F/
°
C make-up water temperature
_____ Freeze cycle time (minutes)
_____ Harvest cycle time (minutes)
_____ First ice out (seconds)
_____ All ice out (seconds)
_____ Pounds of ice per cycle
Capacity check: ice weight per cycle
X 1440 = _________ lbs. (24 hr. capacity)
total cycle time (min) _____
Remarks:_________________________________________________________________________
_________________________________________________________________________________
Содержание TUBE-ICE 03TA
Страница 10: ...5 24 11 Blank page ...
Страница 14: ...03TA Service Manual INTRODUCTION 4 21 14 1 4 FIGURE 1 1 Assembly Air Cooled Front View ...
Страница 15: ...03TA Service Manual INTRODUCTION 4 21 14 1 5 FIGURE 1 2 Assembly Air Cooled Rear View ...
Страница 16: ...03TA Service Manual INTRODUCTION 4 21 14 1 6 FIGURE 1 3 Assembly Air Cooled Right Side View ...
Страница 17: ...03TA Service Manual INTRODUCTION 4 21 14 1 7 FIGURE 1 4 Assembly Water Cooled Front View ...
Страница 18: ...03TA Service Manual INTRODUCTION 4 21 14 1 8 FIGURE 1 5 Assembly Water Cooled Rear View ...
Страница 19: ...03TA Service Manual INTRODUCTION 4 21 14 1 9 FIGURE 1 6 Assembly Water Cooled Right Side View ...
Страница 20: ...03TA Service Manual INTRODUCTION 4 21 14 1 10 BLANK ...
Страница 44: ...5 24 11 Blank page ...
Страница 47: ...03TA Service Manual HOW YOUR TUBE ICE MACHINE WORKS 4 11 2014 4 3 FIGURE 4 1 Water Cooled Piping Schematic ...
Страница 48: ...03TA Service Manual HOW YOUR TUBE ICE MACHINE WORKS 3 31 2014 4 4 FIGURE 4 2 Air Cooled Piping Schematic ...
Страница 54: ...5 24 11 Blank page ...
Страница 56: ...03TA Service Manual ELECTRICAL CONTROLS 4 17 14 6 2 FIGURE 6 2 Control Panel Components Standard ...
Страница 61: ...03TA Service Manual ELECTRICAL CONTROLS 3 31 14 6 7 FIGURE 6 3 Electrical Schematic All Voltages 50 60 Hz ...
Страница 102: ...03TA Service Manual SERVICE OPERATIONS 4 2 14 9 20 FIGURE 9 14 Cutter Water Tank and Drive Gear Assembly ...
Страница 104: ...5 24 11 Blank page ...
Страница 111: ...03TA Service Manual 10 7 OPTIONS AND ACCESSORIES FIGURE 10 4 Wiring Schematic Mid Size Machine P112 P118 P18XT ...
Страница 112: ...5 24 11 Blank page ...
Страница 122: ...03TA Service Manual INDEX 4 21 14 12 4 ...