
03TA Service Manual
INSTALLING YOUR TUBE-ICE
®
MACHINE
3-7
Water-Cooled Connections
Connect water supply to the water regulator valve on condenser water inlet connection (bottom
connection on condenser). Connect the condenser water out line to the top connection on the
condenser.
FIGURE 3-5
Water Cooled Condenser Connections
Cooling Tower.
For water cooled machines only.
When selecting a cooling tower, careful attention must be given
to operating wet bulb conditions. It is advisable to check with your local cooling tower distributor
for their recommendations based on actual operating conditions in your area. An average wet-bulb
of 78
°
F is typical in the U.S. but many localities have design wet-bulbs as low as 72
°
F or as high as
82
°
F.
The cooling tower water pump must be capable of delivering the required volume of water through
the condenser. Due to cooling tower location and pressure drop through water lines and water
regulating valves, the pump must be sized for each installation. Refer to TABLE 11-1 for condenser
water requirements. The water piping for the cooling tower and the installation of the pump must be
in accordance with the manufacturer’s instructions.
Proper water treatment for the prevention of mineral and foreign matter accumulation in the
condenser or cooling tower is recommended. A water analysis should be obtained to determine the
proper chemicals to use.
1 1/4” FPT
Condenser
Water Inlet
1 1/4” FPT
Condenser
Water Outlet
Содержание TUBE-ICE 03TA
Страница 10: ...5 24 11 Blank page ...
Страница 14: ...03TA Service Manual INTRODUCTION 4 21 14 1 4 FIGURE 1 1 Assembly Air Cooled Front View ...
Страница 15: ...03TA Service Manual INTRODUCTION 4 21 14 1 5 FIGURE 1 2 Assembly Air Cooled Rear View ...
Страница 16: ...03TA Service Manual INTRODUCTION 4 21 14 1 6 FIGURE 1 3 Assembly Air Cooled Right Side View ...
Страница 17: ...03TA Service Manual INTRODUCTION 4 21 14 1 7 FIGURE 1 4 Assembly Water Cooled Front View ...
Страница 18: ...03TA Service Manual INTRODUCTION 4 21 14 1 8 FIGURE 1 5 Assembly Water Cooled Rear View ...
Страница 19: ...03TA Service Manual INTRODUCTION 4 21 14 1 9 FIGURE 1 6 Assembly Water Cooled Right Side View ...
Страница 20: ...03TA Service Manual INTRODUCTION 4 21 14 1 10 BLANK ...
Страница 44: ...5 24 11 Blank page ...
Страница 47: ...03TA Service Manual HOW YOUR TUBE ICE MACHINE WORKS 4 11 2014 4 3 FIGURE 4 1 Water Cooled Piping Schematic ...
Страница 48: ...03TA Service Manual HOW YOUR TUBE ICE MACHINE WORKS 3 31 2014 4 4 FIGURE 4 2 Air Cooled Piping Schematic ...
Страница 54: ...5 24 11 Blank page ...
Страница 56: ...03TA Service Manual ELECTRICAL CONTROLS 4 17 14 6 2 FIGURE 6 2 Control Panel Components Standard ...
Страница 61: ...03TA Service Manual ELECTRICAL CONTROLS 3 31 14 6 7 FIGURE 6 3 Electrical Schematic All Voltages 50 60 Hz ...
Страница 102: ...03TA Service Manual SERVICE OPERATIONS 4 2 14 9 20 FIGURE 9 14 Cutter Water Tank and Drive Gear Assembly ...
Страница 104: ...5 24 11 Blank page ...
Страница 111: ...03TA Service Manual 10 7 OPTIONS AND ACCESSORIES FIGURE 10 4 Wiring Schematic Mid Size Machine P112 P118 P18XT ...
Страница 112: ...5 24 11 Blank page ...
Страница 122: ...03TA Service Manual INDEX 4 21 14 12 4 ...