
03TA Service Manual
MAINTENANCE
3/31/14
7-7
Vent Plug
Drain Plug
Oil Level Plug
Vent Plug
Compressor
HP
Oil Charge
(oz)
3DE3R & 3DEHR
6.5
125
3DP3R & 3DPHR
7.5
125
TABLE 7-3
Compressor Oil Capacity
An oil pump should be used to force any oil that may be required into the system. Oil may be added
to the compressor through the low pressure test connection adjacent to the high/low pressure switch
or through the compressor suction service valve. The compressor suction service valve should be
“backseated” to shut off pressure to the gauge port when connecting the oil pump. Air should be
purged from the oil pump discharge line by forcing some oil through the line before tightening the
charging connection.
Cutter Gear Reducer.
The oil level for the gear reducer should be checked if there is evidence of a
leak. It should be level with the plugged opening in the side of the gear housing. Use Mobile 600W
cylinder oil or equal. Change oil once a year.
Note: Ventless gear reducer used after August 2010
FIGURE 7-2
Gear Reducer
Gear Reducer (10:1)
Part #:
Replacement food grade oil:
Part #: 19T3020C01
Texaco Cygnus 220
Oil Capacity: 8 ounces
Содержание TUBE-ICE 03TA
Страница 10: ...5 24 11 Blank page ...
Страница 14: ...03TA Service Manual INTRODUCTION 4 21 14 1 4 FIGURE 1 1 Assembly Air Cooled Front View ...
Страница 15: ...03TA Service Manual INTRODUCTION 4 21 14 1 5 FIGURE 1 2 Assembly Air Cooled Rear View ...
Страница 16: ...03TA Service Manual INTRODUCTION 4 21 14 1 6 FIGURE 1 3 Assembly Air Cooled Right Side View ...
Страница 17: ...03TA Service Manual INTRODUCTION 4 21 14 1 7 FIGURE 1 4 Assembly Water Cooled Front View ...
Страница 18: ...03TA Service Manual INTRODUCTION 4 21 14 1 8 FIGURE 1 5 Assembly Water Cooled Rear View ...
Страница 19: ...03TA Service Manual INTRODUCTION 4 21 14 1 9 FIGURE 1 6 Assembly Water Cooled Right Side View ...
Страница 20: ...03TA Service Manual INTRODUCTION 4 21 14 1 10 BLANK ...
Страница 44: ...5 24 11 Blank page ...
Страница 47: ...03TA Service Manual HOW YOUR TUBE ICE MACHINE WORKS 4 11 2014 4 3 FIGURE 4 1 Water Cooled Piping Schematic ...
Страница 48: ...03TA Service Manual HOW YOUR TUBE ICE MACHINE WORKS 3 31 2014 4 4 FIGURE 4 2 Air Cooled Piping Schematic ...
Страница 54: ...5 24 11 Blank page ...
Страница 56: ...03TA Service Manual ELECTRICAL CONTROLS 4 17 14 6 2 FIGURE 6 2 Control Panel Components Standard ...
Страница 61: ...03TA Service Manual ELECTRICAL CONTROLS 3 31 14 6 7 FIGURE 6 3 Electrical Schematic All Voltages 50 60 Hz ...
Страница 102: ...03TA Service Manual SERVICE OPERATIONS 4 2 14 9 20 FIGURE 9 14 Cutter Water Tank and Drive Gear Assembly ...
Страница 104: ...5 24 11 Blank page ...
Страница 111: ...03TA Service Manual 10 7 OPTIONS AND ACCESSORIES FIGURE 10 4 Wiring Schematic Mid Size Machine P112 P118 P18XT ...
Страница 112: ...5 24 11 Blank page ...
Страница 122: ...03TA Service Manual INDEX 4 21 14 12 4 ...