185
H
Handling....................................................................... 9
Heating circuit assignment....................................... 175
Heating curve............................................................. 88
Heating curve level.....................................................89
Heating curve slope................................................... 89
Heating surfaces, cleaning...................................78, 80
Heating water, filling................................................... 53
Heat-up time.............................................................174
I
Ignition........................................................................78
Ignition electrodes...................................................... 78
Inverter......................................... 15, 16, 17, 18, 19, 21
Ionisation electrode.................................................... 78
K
KM-BUS connections................................................. 38
L
Language setting, changing....................................... 59
LON............................................................................73
– Fault monitoring...................................................... 74
– Subscriber check.....................................................74
– Subscriber number setting...................................... 73
Low voltage grid........................... 15, 16, 17, 18, 19, 21
M
Main power supply................................... 16, 17, 18, 19
Mains isolator............................................................. 20
Mains parallel mode................................................... 14
Mains power, switching on......................................... 58
Maintenance, terminating...........................................86
Manufacturer's certificate......................................... 183
Meter cupboard.......................................................... 15
Mixer open/closed.................................................... 134
O
ON/OFF switch...........................................................15
Operating conditions, scanning................................ 111
Operating data, scanning..........................................111
Operating program changeover............................... 169
Outlet temperature sensor....................................... 128
Outside temperature sensor...............................35, 126
Overload protection..................................16, 17, 18, 19
P
Parallel mode............................................................. 14
Plate heat exchanger............................................... 130
Positioning....................................................................8
Power distribution.....................................16, 17, 18, 19
Power supply..............................................................39
Preparing
– connections............................................................. 11
Process controller...................................................... 33
Programming unit, fuel cell module............................66
Property boundary....................................16, 17, 18, 19
Protective devices...................................................... 21
R
Raising reduced room temperature..........................173
RCD..................................................................... 20, 21
Reduced set room temperature................................. 89
Reducing heat-up output..........................................173
Reducing heat-up time............................................. 174
Relay test..................................................................112
Remote control.........................................................175
Removing a fault display.......................................... 115
Removing the front panels......................................... 52
Report...................................................................... 180
Reset data, fuel cell..................................................114
Resetting codes................................................... 92, 98
Response characteristics........................................... 21
Response times......................................................... 21
Return temperature sensor...................................... 129
Rotational direction, mixer motor
– Changing...............................................................134
– Checking............................................................... 134
S
Safety chain............................................................. 133
Scanning
– Service message.....................................................90
Screed drying........................................................... 171
Screed drying function............................................. 171
Selective sizing.......................................................... 21
Selectivity............................................................. 20, 21
Service level call-up................................................. 110
Service menu call-up................................................110
Service message
– Scanning................................................................. 90
Service mode............................................................. 75
Set room temperature selection................................. 89
Setting the heating output.......................................... 74
Short circuit protection............................. 16, 17, 18, 19
Siting............................................................................ 9
Spare parts
– Overview............................................................... 137
Specification.............................................................181
Standard set room temperature................................. 89
Start time optimisation................................................73
Static pressure
– Fuel cell...................................................................64
– Gas condensing boiler............................................ 63
Sub-distribution board.......................................... 15, 21
Supply pressure......................................................... 63
System
– Draining.................................................................124
System, filling....................................................... 53, 56
System pressure........................................................ 56
System pressure, checking........................................ 85
System schemes..................................................88, 92
T
Temperature limiter.................................................. 133
Tightness test, balanced flue system......................... 75
Time, setting...............................................................59
Transfer point....................................................... 16, 17
Trap............................................................................ 79
Keyword index
Keyword index
(cont.)
5775 636 GB
Содержание C3TB
Страница 44: ...44 3 5 1 2x 2 4 7 6 Fig 43 Installation sequence Fitting the front panels 5775 636 GB Installation ...
Страница 48: ...48 14 Fig 47 Installation sequence If required for easier handling Dismantling cont 5775 636 GB Installation ...
Страница 136: ...136 Troubleshooting Repairs gas condensing module cont 5775 636 GB Diagnosis ...
Страница 143: ...143 Parts lists Heat cell assembly 5775 636 GB Components ...
Страница 148: ...148 0001 0001 0003 0003 0002 0002 0004 Fig 118 Parts lists External connection assembly 5775 636 GB Components ...
Страница 154: ...154 0006 0003 0005 0001 0002 0004 Fig 121 Parts lists Miscellaneous assembly 5775 636 GB Components ...
Страница 160: ...160 Parts not shown 0009 PCB IU100 B30 Parts lists Fuel cell assembly 5775 636 GB Components ...
Страница 161: ...161 Parts lists Fuel cell assembly cont 5775 636 GB Components ...
Страница 187: ...187 5775 636 GB ...