34
Making the electrical connection between the fuel cell module and the gas condensing module
Check that the fuel cell module is switched off
A
Fig. 31
1.
Remove the front panel of the fuel cell module (see
page 52).
2.
Before connecting the fuel cell module, ensure that
ON/OFF switch
A
on the fuel cell module is
switched off (0).
Connecting the fuel cell module to the process controller
?
BU
BN
GN/GY
N
L
Fig. 32
1.
Attach connecting cable
A
to the fuel cell module
using the plug provided.
In its delivered condition, the plug is connected to
the process controller (see diagram below).
Installation sequence
Electrical connections
(cont.)
5775 636 GB
Installation
Содержание C3TB
Страница 44: ...44 3 5 1 2x 2 4 7 6 Fig 43 Installation sequence Fitting the front panels 5775 636 GB Installation ...
Страница 48: ...48 14 Fig 47 Installation sequence If required for easier handling Dismantling cont 5775 636 GB Installation ...
Страница 136: ...136 Troubleshooting Repairs gas condensing module cont 5775 636 GB Diagnosis ...
Страница 143: ...143 Parts lists Heat cell assembly 5775 636 GB Components ...
Страница 148: ...148 0001 0001 0003 0003 0002 0002 0004 Fig 118 Parts lists External connection assembly 5775 636 GB Components ...
Страница 154: ...154 0006 0003 0005 0001 0002 0004 Fig 121 Parts lists Miscellaneous assembly 5775 636 GB Components ...
Страница 160: ...160 Parts not shown 0009 PCB IU100 B30 Parts lists Fuel cell assembly 5775 636 GB Components ...
Страница 161: ...161 Parts lists Fuel cell assembly cont 5775 636 GB Components ...
Страница 187: ...187 5775 636 GB ...