19
Connection for excess export with power storage system
On-site energy consumption to paragraphs 33 and 4(3)
KWK [Germany]
B
C
D
E
F
G
K
L
Z2b
A
N
O
H
1~/N/PE
M
400 V / 230 V~
~
P
kWh
Z1
kWh
Z3
kWh
Z3b
G
K
L
Z2a
=
R
S
T
1~/N/PE
~
kWh
Z4
~
U
V
kWh
Fig. 13
A
Low voltage grid
B
Main power supply
C
Domestic distribution box
D
Property boundary
E
Grid operator
F
Customer
G
Power distribution
H
On-site consumers
K
Short circuit protection
L
Overload protection, RCD
M
Vitovalor 300-P
N
GS protection
O
Inverter (DC/AC converter) S
EMAX
= 1.5 kVA
P
Fuel cell
R
GS protection for PV system
S
PV inverter
T
Photovoltaic system
U
Power storage system inverter
V
Power storage unit
Z1
Balancing bi-directional meter (observe meter cir-
cuit)
Electricity meter for power export and drawing
Preparing for installation
Notes on connecting to the mains supply
(cont.)
5775 636 GB
Installation
Содержание C3TB
Страница 44: ...44 3 5 1 2x 2 4 7 6 Fig 43 Installation sequence Fitting the front panels 5775 636 GB Installation ...
Страница 48: ...48 14 Fig 47 Installation sequence If required for easier handling Dismantling cont 5775 636 GB Installation ...
Страница 136: ...136 Troubleshooting Repairs gas condensing module cont 5775 636 GB Diagnosis ...
Страница 143: ...143 Parts lists Heat cell assembly 5775 636 GB Components ...
Страница 148: ...148 0001 0001 0003 0003 0002 0002 0004 Fig 118 Parts lists External connection assembly 5775 636 GB Components ...
Страница 154: ...154 0006 0003 0005 0001 0002 0004 Fig 121 Parts lists Miscellaneous assembly 5775 636 GB Components ...
Страница 160: ...160 Parts not shown 0009 PCB IU100 B30 Parts lists Fuel cell assembly 5775 636 GB Components ...
Страница 161: ...161 Parts lists Fuel cell assembly cont 5775 636 GB Components ...
Страница 187: ...187 5775 636 GB ...