24
0
1.
Route the connection lines through the side open-
ings in the gas condensing module:
■
the gas line and one heating water line through
the rectangular aperture
■
one heating water line through the round open-
ing directly below the rectangular aperture
■
cables from the fuel cell module through the rec-
tangular aperture
Attach the connecting lines at the back of the fuel
cell module.
Never kink lines (min. bending radius 20 mm).
0
2.
Connect the gas and heating water lines to the
gas condensing module using gaskets.
■
Torque G
½
: 30 Nm
■
Torque G
⅜
: 10 Nm
Note
Unscrew the cap on the gas connection. Use the
gasket supplied for the connection.
0
3.
Ensure connecting sets (accessories) are moun-
ted to the gas condensing module.
0
4.
Route condensate drain hose
D
from the gas
condensing module with a constant fall to on-site
drainage system (see page 29).
0
5.
Position and align the gas condensing module
against the wall (see page 25).
0
6.
Affix the spacers onto the side panel of the fuel
cell module as shown.
0
7.
Attach the separate diaphragm expansion vessel
(standard delivery). See page 24.
0
8.
Connect the gas and heating water lines to the
fuel cell module using gaskets.
■
Torque G
½
: 30 Nm
■
Torque G
⅜
: 10 Nm
Route the lines in such a way that they do not
kink. Using cable ties, attach the gas line to the
frame of the fuel cell module.
0
9.
Connect condensate drain hose
K
to the fuel cell
module. Route the drain hose with a constant fall
to on-site drainage system.
10.
Position and align the fuel cell module against the
wall (see page 25).
Mounting the diaphragm expansion vessel
1.
3.
2.
4.
5.
4x
Fig. 18
1.
Attach the tee with gasket to the heating water
return of the fuel cell module.
2.
Attach the heating water return line from the fuel
cell module to the tee, using a gasket.
3.
Attach the connection line from the diaphragm
expansion vessel to the tee, using a gasket.
Installation sequence
Installing the Vitovalor 300-P
(cont.)
5775 636 GB
Installation
Содержание C3TB
Страница 44: ...44 3 5 1 2x 2 4 7 6 Fig 43 Installation sequence Fitting the front panels 5775 636 GB Installation ...
Страница 48: ...48 14 Fig 47 Installation sequence If required for easier handling Dismantling cont 5775 636 GB Installation ...
Страница 136: ...136 Troubleshooting Repairs gas condensing module cont 5775 636 GB Diagnosis ...
Страница 143: ...143 Parts lists Heat cell assembly 5775 636 GB Components ...
Страница 148: ...148 0001 0001 0003 0003 0002 0002 0004 Fig 118 Parts lists External connection assembly 5775 636 GB Components ...
Страница 154: ...154 0006 0003 0005 0001 0002 0004 Fig 121 Parts lists Miscellaneous assembly 5775 636 GB Components ...
Страница 160: ...160 Parts not shown 0009 PCB IU100 B30 Parts lists Fuel cell assembly 5775 636 GB Components ...
Страница 161: ...161 Parts lists Fuel cell assembly cont 5775 636 GB Components ...
Страница 187: ...187 5775 636 GB ...