101
Coding in the delivered condition
Possible change
The internal circulation pump only
starts upon heat demand if the burn-
er is active.
The circulation pump stops on expiry
of the run-on time.
51:2
System with heating water buffer
cylinder:
The internal circulation pump only
starts upon heat demand if the burn-
er is active.
The circulation pump stops on expiry
of the run-on time.
52:0
Without flow temperature sensor
for low loss header
52:1
With flow temperature sensor for low
loss header (automatic recognition)
54:0
Never adjust.
6E:50
No display correction for outside
temperature
6E:0
to
6E:49
Display correction
–
5 K
to
Display correction
–
0.1 K
6E:51
to
6E:99
Display corr0.1 K
to
Display corr4.9 K
76:0
Without LON communication mod-
ule
76:1
With LON communication module
(automatic recognition)
77:1
LON subscriber number
77:2
to
77:99
LON subscriber number adjustable
from 1 to 99:
1 - 4 = Boiler
27 = Fuel cell module
28 - 97 = Vitotronic 200-H
98 = Vitogate
99 = Vitocom
79:1
Control unit for weather-compen-
sated operation with LON commu-
nication module:
Control unit is fault manager
79:0
Control unit is not fault manager.
7b:1
Control unit for weather-compen-
sated operation with LON commu-
nication module:
Control unit transmits the time
7b:0
No time transmission.
7F:1
Detached house
7F:0
Apartment building
Holiday program and time program
for DHW heating can be set sepa-
rately
80:6
A fault message is issued if a fault
arises for at least 30 s.
80:0
Immediate fault message
80:2
to
80:199
Minimum fault duration before a fault
message is issued, adjustable from
10 to 995 s.
1 step
≙
5 s
81:1
Automatic summer/wintertime
changeover
81:0
Manual summer/wintertime change-
over
81:2
Use of the radio clock receiver (au-
tomatic recognition)
81:3
With LON communication module:
Control unit receives the time
82:0
Operation with natural gas
82:1
Operation with LPG (do not set)
Codes
Coding level 2
(cont.)
5775 636 GB
Codes
Содержание C3TB
Страница 44: ...44 3 5 1 2x 2 4 7 6 Fig 43 Installation sequence Fitting the front panels 5775 636 GB Installation ...
Страница 48: ...48 14 Fig 47 Installation sequence If required for easier handling Dismantling cont 5775 636 GB Installation ...
Страница 136: ...136 Troubleshooting Repairs gas condensing module cont 5775 636 GB Diagnosis ...
Страница 143: ...143 Parts lists Heat cell assembly 5775 636 GB Components ...
Страница 148: ...148 0001 0001 0003 0003 0002 0002 0004 Fig 118 Parts lists External connection assembly 5775 636 GB Components ...
Страница 154: ...154 0006 0003 0005 0001 0002 0004 Fig 121 Parts lists Miscellaneous assembly 5775 636 GB Components ...
Страница 160: ...160 Parts not shown 0009 PCB IU100 B30 Parts lists Fuel cell assembly 5775 636 GB Components ...
Страница 161: ...161 Parts lists Fuel cell assembly cont 5775 636 GB Components ...
Страница 187: ...187 5775 636 GB ...