12
1932
1998
1667 1766
595
29
Ø 40
177
1139
A
Fig. 5
A
Condensate drain in the wall
Observe the necessary fall.
480
398
237
456
595
377
516
191
5
1085
496
1085
5
480
377
516
237
595
898
456
104
83
B
C
Fig. 6
B
Fuel cell module to the right of the gas condensing
module
C
Fuel cell module to the left of the gas condensing
module
Note
All height dimensions have a tolerance of +15 mm on
account of the adjustable feet.
Preparing for installation
Preparing for installation
(cont.)
5775 636 GB
Installation
Содержание C3TB
Страница 44: ...44 3 5 1 2x 2 4 7 6 Fig 43 Installation sequence Fitting the front panels 5775 636 GB Installation ...
Страница 48: ...48 14 Fig 47 Installation sequence If required for easier handling Dismantling cont 5775 636 GB Installation ...
Страница 136: ...136 Troubleshooting Repairs gas condensing module cont 5775 636 GB Diagnosis ...
Страница 143: ...143 Parts lists Heat cell assembly 5775 636 GB Components ...
Страница 148: ...148 0001 0001 0003 0003 0002 0002 0004 Fig 118 Parts lists External connection assembly 5775 636 GB Components ...
Страница 154: ...154 0006 0003 0005 0001 0002 0004 Fig 121 Parts lists Miscellaneous assembly 5775 636 GB Components ...
Страница 160: ...160 Parts not shown 0009 PCB IU100 B30 Parts lists Fuel cell assembly 5775 636 GB Components ...
Страница 161: ...161 Parts lists Fuel cell assembly cont 5775 636 GB Components ...
Страница 187: ...187 5775 636 GB ...