8
Commercial or industrial usage for a purpose other
than heating the building or DHW shall be deemed
inappropriate.
Any usage beyond this must be approved by the man-
ufacturer in each individual case.
Incorrect usage or operation of the appliance (e.g. the
appliance being opened by the system user) is prohibi-
ted and results in an exclusion of liability. Incorrect
usage also occurs if the components in the heating
system are modified from their intended use (e.g. if the
flue gas and ventilation air paths are sealed).
Product information
Vitovalor 300-P, type C3TB
Preset for operation with natural gas E, adjustable to
natural gas LL
The Vitovalor 300-P may in principle be supplied only
to the countries indicated on the type plate. For deliv-
eries to other countries, approved contractors must
arrange individual approval on their own initiative and
in accordance with the law of the country in question.
Note on positioning
When the Vitovalor 300-P is installed close to the
coast, it should be positioned such that the flue gas
and ventilation air apertures do not come into direct
contact with saline air, in order to prevent damage due
to corrosion.
Minimum temperature inside the installation room
+3 °C
Vitovalor 300-P in systems with photovoltaic and
solar thermal equipment
Operating the Vitovalor 300-P in conjunction with a
photovoltaic or solar thermal system is not recommen-
ded. An integral PV system would falsify the statistical
data of the energy manager as it is not designed for
such a combination. Vitovalor 300-P runtimes could be
reduced and economically efficient operation would no
longer be guaranteed. The same applies if the
Vitovalor 300-P is operated in conjunction with a solar
thermal system or any additional heat generator. The
integral heating water buffer cylinder would be heated
additionally which would, in turn, reduce the
Vitovalor 300-P runtime. If the Vitovalor 300-P is nev-
ertheless operated in conjunction with a photovoltaic or
solar thermal system, a higher ranking energy man-
ager must be provided on site.
Information
Intended use
(cont.)
5775 636 GB
Information
Содержание C3TB
Страница 44: ...44 3 5 1 2x 2 4 7 6 Fig 43 Installation sequence Fitting the front panels 5775 636 GB Installation ...
Страница 48: ...48 14 Fig 47 Installation sequence If required for easier handling Dismantling cont 5775 636 GB Installation ...
Страница 136: ...136 Troubleshooting Repairs gas condensing module cont 5775 636 GB Diagnosis ...
Страница 143: ...143 Parts lists Heat cell assembly 5775 636 GB Components ...
Страница 148: ...148 0001 0001 0003 0003 0002 0002 0004 Fig 118 Parts lists External connection assembly 5775 636 GB Components ...
Страница 154: ...154 0006 0003 0005 0001 0002 0004 Fig 121 Parts lists Miscellaneous assembly 5775 636 GB Components ...
Страница 160: ...160 Parts not shown 0009 PCB IU100 B30 Parts lists Fuel cell assembly 5775 636 GB Components ...
Страница 161: ...161 Parts lists Fuel cell assembly cont 5775 636 GB Components ...
Страница 187: ...187 5775 636 GB ...