11
1125
5
40
237
134
2082
2147
2250
20
595
Fig. 4
Fuel cell module to the right of the gas con-
densing module
Preparing for installation
Use a connection set – available as an accessory – to
make the connections on the gas and water sides.
Fitting accessories
Before final siting, attach all of the accessories that are
to be mounted from the back of the boiler (e.g. connec-
tion sets).
!
Please note
Avoid damaging the appliance.
Connect all pipework free of load and torque
stress.
Preparing connections on site:
Connection set installation instructions
Preparing for installation
Siting
(cont.)
5775 636 GB
Installation
Содержание C3TB
Страница 44: ...44 3 5 1 2x 2 4 7 6 Fig 43 Installation sequence Fitting the front panels 5775 636 GB Installation ...
Страница 48: ...48 14 Fig 47 Installation sequence If required for easier handling Dismantling cont 5775 636 GB Installation ...
Страница 136: ...136 Troubleshooting Repairs gas condensing module cont 5775 636 GB Diagnosis ...
Страница 143: ...143 Parts lists Heat cell assembly 5775 636 GB Components ...
Страница 148: ...148 0001 0001 0003 0003 0002 0002 0004 Fig 118 Parts lists External connection assembly 5775 636 GB Components ...
Страница 154: ...154 0006 0003 0005 0001 0002 0004 Fig 121 Parts lists Miscellaneous assembly 5775 636 GB Components ...
Страница 160: ...160 Parts not shown 0009 PCB IU100 B30 Parts lists Fuel cell assembly 5775 636 GB Components ...
Страница 161: ...161 Parts lists Fuel cell assembly cont 5775 636 GB Components ...
Страница 187: ...187 5775 636 GB ...