background image

MMAKTEK

® 

INSTALLATION USE AND MAINTAINENCE GUIDE FOR 

AUTOMATIC 4

P

ASS AND DOUBLE FUEL BOILERS

25 MKB-S - 40 MKB-S - 60 MKB-S  

25 MKBC - 40 MKBC - 60 MKBC 

kk 07 

CE 

TS EN ISO 9001:2015

rev

.  na: 04 

Please read. 

Please keep. 

Содержание 25 MKB-S

Страница 1: ...KTEK INSTALLATION USE AND MAINTAINENCE GUIDE FOR AUTOMATIC 4PASS AND DOUBLE FUEL BOILERS 25 MKB S 40 MKB S 60 MKB S 25 MKBC 40 MKBC 60 MKBC kk 07 CE TS EN ISO 9001 2015 rev na 04 Please read Please ke...

Страница 2: ...ATER FLOOD BOILER INSTALLATION SCHEMA 4 2 AIR CONNECTION 4 3 CHIMNEY CHIMNEY CONNECTION SCHEMA 5 TECHICAL FEATURES 6 CONTROL PANEL 7 FIRST OPERATION AND USE 7 1 FIRST BURNING 7 2 WARNINGS FOR USE 8 CL...

Страница 3: ...Turkey and World market Our company which has acquired advanced technology and superior quality stands on in accordance with these principles This handbook is a helpful guide during operation and mai...

Страница 4: ...is strictly forbidden Please do not operate the boiler without water Do not feed cold water to hot boiler If for any reason the boiler temprature is over 90 C do not attempt to feed cold water to the...

Страница 5: ...ndan ayarlayarak izleme imkan Opportunity for watching and setting feeding and waiting time on the electronic panel control Detritions on heating are minimised with the cast burning bunker Fan with qu...

Страница 6: ...3 SECTIONS OF THE BOILER See techic table for dimensions stated with letters 6...

Страница 7: ...tallations Boiler must be connected to a good drawing chimney and minimum quantity elbows should be used between chimney and boiler Boiler must be placed where has enough air for an efificient burning...

Страница 8: ...water return pipe Attention should be paid to leave enough working space for service intervention boiler control and fuel feeding while installation Valve connection should be made on boiler water ent...

Страница 9: ...of hot water must be provided by natural circulation The diameter of the pipe to be used at by pass line should be the same diameter size with the pipe used in installation at minimum As an extra secu...

Страница 10: ...BOILER INSTALLATION SCHEMA 10...

Страница 11: ...al length must not be shorter than 60 cm and longer than 2 meters and pipe must be connected to the chimney with minimum 10 degree of angle We suggest not to use enamel stove pipes as it creates tar i...

Страница 12: ...e building if the chimney must pass from outside the isolation must be done properly The chimney must be frequently cleaned in order to avoid tar and soot and clogs Please avoid foreign objects cement...

Страница 13: ...5 TECHNICAL SPECIFICATION 13...

Страница 14: ...n setting condition setting value is shown in screen Fuel Waiting time setting button Sets the waiting period after fuel loading 04 255 sec Fuel feeding Time setting button Sets fuel loading period 04...

Страница 15: ...prevents entrance of foreign materials big sized coal pieces inside the bunker and prevents damage to the reducer and loading spiral Also passes the proper size of coal which will burn easily and eff...

Страница 16: ...ater decreases 5 C below set degree Running and stopping of circulation pump and fan can be followed by blinking leds on digital display on control panel Circulation pump will run automatically 3 seco...

Страница 17: ...ich don t have air flow should be opened Air holes should be cleaned up by running fan free Electricity connection shoul be cut off before the maintainance Electricity chimney installation connections...

Страница 18: ...10 ELECTRICITY SCHEMA 18...

Страница 19: ...uel wet spilled stucked and can not be loaded Fuel is pumped down by applying pressure with an object Smoke comes from chimney connections There is H3 warning on control panel digital screen H1 warnin...

Страница 20: ...e of the supporting ring When the boiler lifted up with crane there shouldn t any living being under the boiler Boiler must be carried with its accessories installed on it B CARRYING BOILER ON VEHICLE...

Страница 21: ...Seller Maktek Kazan Radyator Klima San A 10013 Sk No 14 A O S B i li ZM R Tel 0 232 328 21 06 07 08 Faks 0 232 328 04 86 www maktek com tr info maktek com tr...

Отзывы: