Quitting "Commissioning/maintenance" mode
1.
Select
"01"
under
ITEM
using / .
2.
Press
SET
to confirm.
3.
Select
"OFF"
in
SET
using / .
4.
Press
SET
to confirm.
The
MNT
indicator extinguishes.
Activating start time optimisation
Values for start time optimisation captured during com-
missioning are deleted.
In control mode, start times are then changed accord-
ing to usage characteristics for the whole system,
thereby optimising power generation.
1.
Check that the
MNT
indicator is lit.
2.
Select
"19"
using / .
19
ITEM
STATE
3.
Press and hold
SET
for at least 3 s. During the
process, the dot under
ITEM
will flash.
When
"CL"
appears under
STATE
, start time opti-
misation is enabled.
Ending commissioning mode
–
switching to standard mode
1.
Check whether the fuel cell module is set to
"Energy manager ON"
(delivered condition) or
"Energy manager OFF"
2.
Check that the
MNT
indicator is lit.
Depending on the commissioning mode, either
"11"
or
"13"
will be displayed under
ITEM
.
3.
Select
"17"
using / .
■
Power generation continues.
■
Commissioning mode will be terminated.
■
Gas and power supply remain on.
4.
Press and hold
SET
until
"oFF"
appears under
STATE
.
Commissioning mode has terminated when the
MNT
indicator is no longer lit. The fuel cell module
switches to control mode.
Note
Electrical output generated in control mode can be
scanned. See page 113.
Linking the fuel cell module and other subscribers in LON
Note
Data transfer via LON can take several minutes.
Set LON subscriber numbers and further functions via
code 2 (see the following table)
Note
The same subscriber number must
not
be allocated
twice within the LON.
Only one Vitotronic
may be programmed as fault
manager.
Commissioning, inspection, maintenance
Commissioning the fuel cell module
(cont.)
5775 636 GB
Содержание C3TB
Страница 44: ...44 3 5 1 2x 2 4 7 6 Fig 43 Installation sequence Fitting the front panels 5775 636 GB Installation ...
Страница 48: ...48 14 Fig 47 Installation sequence If required for easier handling Dismantling cont 5775 636 GB Installation ...
Страница 136: ...136 Troubleshooting Repairs gas condensing module cont 5775 636 GB Diagnosis ...
Страница 143: ...143 Parts lists Heat cell assembly 5775 636 GB Components ...
Страница 148: ...148 0001 0001 0003 0003 0002 0002 0004 Fig 118 Parts lists External connection assembly 5775 636 GB Components ...
Страница 154: ...154 0006 0003 0005 0001 0002 0004 Fig 121 Parts lists Miscellaneous assembly 5775 636 GB Components ...
Страница 160: ...160 Parts not shown 0009 PCB IU100 B30 Parts lists Fuel cell assembly 5775 636 GB Components ...
Страница 161: ...161 Parts lists Fuel cell assembly cont 5775 636 GB Components ...
Страница 187: ...187 5775 636 GB ...