Note
Temperature profile 6 ends after 21 days.
Observe EN 1264. The report to be provided by the
heating contractor must contain the following details
regarding heat-up:
■
Heat-up data with respective flow temperatures
■
Max. flow temperature achieved
■
Operating state and outside temperature during
handover
Various temperature profiles can be set via coding
address "F1" in the
"Heating circuit"
group.
The function continues after power failure or after the
control unit has been switched off. "Heating and DHW"
is started when screed drying is finished or if code
"F1:0" is set manually.
Temperature profile 1: (EN 1264-4) code "F1:1"
Flow temperature
°C
1
5
10
15
20
25
30
Days
50
40
30
20
10
Fig. 84
Temperature profile 2: (ZV parquet and flooring technology) code "F1:2"
Flow temperature
°C
Days
50
40
30
20
10
1
5
10
15
20
25
30
Fig. 85
Temperature profile 3: Code "F1:3"
Flow temperature
°C
Days
50
40
30
20
10
1
5
10
15
20
25
30
Fig. 86
Temperature profile 4: Code "F1:4"
Flow temperature
°C
Days
50
40
30
20
10
1
5
10
15
20
25
30
Fig. 87
Function description
Control functions
(cont.)
5773 216 GB
Functions
Содержание B2TA
Страница 12: ...12 2 5 1 4 2x 3 Fig 5 Installing the boiler Removing the front panels 5773 216 GB Installation ...
Страница 13: ...13 1 2 SW17 Fig 6 Installing the boiler Siting and levelling the boiler 5773 216 GB Installation ...
Страница 23: ...23 4 1 5 2 2x 3 Fig 16 Installing the boiler Fitting the front panels 5773 216 GB Installation ...
Страница 101: ...101 Parts lists Overview of assemblies 5773 216 GB Components ...
Страница 107: ...107 Parts lists Hydraulics 5773 216 GB Components ...
Страница 118: ...118 0004 0002 0005 0006 0001 0003 Fig 77 Parts lists Miscellaneous 5773 216 GB Components ...
Страница 142: ...142 5773 216 GB ...
Страница 143: ...143 5773 216 GB ...