30
4.
Check the system pressure.
5.
Open the gas shut-off valve.
Activating the venting function
Weather-compensated control unit
Constant temperature control unit
Service menu
1. Press
OK
and
å
simultaneously for approx. 4 s.
2.
"Service functions"
3.
"Venting"
Venting function is enabled.
4. Ending venting function:
Press
OK
or
ä
.
Service menu
1. Press
OK
and
å
simultaneously for approx. 4 s.
2. Select
"
5
"
with
Ú
and confirm with
OK
.
"ON"
flashes.
3. Activate the venting function with
OK
.
"EL on"
is shown constantly.
4. Ending venting function:
Press
ä
.
Filling the siphon with water
C
B
A
Fig. 22
1.
Pivot the control unit forwards.
2.
Remove retaining clip
A
.
3.
Pull filler pipe
B
upwards.
4.
Remove trap
C
downwards.
5.
Fill siphon with water and refit.
6.
Check that the condensate pipe is connected cor-
rectly to the siphon and heat exchanger.
Note
Route the drain hose without any bends and with a
constant fall.
7.
Refit the cover panel.
8.
Secure the control unit back in the operating posi-
tion.
Commissioning, inspection, maintenance
Venting the heating system
(cont.)
5773 216 GB
Содержание B2TA
Страница 12: ...12 2 5 1 4 2x 3 Fig 5 Installing the boiler Removing the front panels 5773 216 GB Installation ...
Страница 13: ...13 1 2 SW17 Fig 6 Installing the boiler Siting and levelling the boiler 5773 216 GB Installation ...
Страница 23: ...23 4 1 5 2 2x 3 Fig 16 Installing the boiler Fitting the front panels 5773 216 GB Installation ...
Страница 101: ...101 Parts lists Overview of assemblies 5773 216 GB Components ...
Страница 107: ...107 Parts lists Hydraulics 5773 216 GB Components ...
Страница 118: ...118 0004 0002 0005 0006 0001 0003 Fig 77 Parts lists Miscellaneous 5773 216 GB Components ...
Страница 142: ...142 5773 216 GB ...
Страница 143: ...143 5773 216 GB ...