38
C
B
A
Fig. 30
1.
Check at the siphon that the condensate can drain
freely.
2.
Remove retaining clip
A
.
3.
Pull filler pipe
B
upwards.
4.
Remove trap
C
downwards.
5.
Remove the condensate hose from trap
C
.
6.
Clean the siphon.
7.
Fill siphon with water and reassemble with retaining
clip
A
.
8.
Check that the condensate pipe is connected cor-
rectly to the siphon and heat exchanger.
Note
Route the drain hose without any bends and with a
constant fall.
Commissioning, inspection, maintenance
Checking the condensate drain and cleaning the…
(cont.)
5773 216 GB
Содержание B2TA
Страница 12: ...12 2 5 1 4 2x 3 Fig 5 Installing the boiler Removing the front panels 5773 216 GB Installation ...
Страница 13: ...13 1 2 SW17 Fig 6 Installing the boiler Siting and levelling the boiler 5773 216 GB Installation ...
Страница 23: ...23 4 1 5 2 2x 3 Fig 16 Installing the boiler Fitting the front panels 5773 216 GB Installation ...
Страница 101: ...101 Parts lists Overview of assemblies 5773 216 GB Components ...
Страница 107: ...107 Parts lists Hydraulics 5773 216 GB Components ...
Страница 118: ...118 0004 0002 0005 0006 0001 0003 Fig 77 Parts lists Miscellaneous 5773 216 GB Components ...
Страница 142: ...142 5773 216 GB ...
Страница 143: ...143 5773 216 GB ...