24
Commissioning steps
Inspection steps
Maintenance steps
Page
•
•
1. Removing the front panels
................................................................................................ 26
•
2. Checking the power supply
•
3. Filling the heating system
................................................................................................. 26
•
4. Filling the DHW cylinder on the DHW side
...................................................................... 27
•
5. Switching on the power supply and the ON/OFF switch
•
6. Selecting the language - only for weather-compensated control units
........................ 27
•
•
7. Setting the time and date - only for weather-compensated control units
.................... 28
•
8. Note on automatic testing of the flue gas temperature sensor
..................................... 28
•
9. Venting the boiler
............................................................................................................... 29
•
10. Venting the heating system
............................................................................................... 29
•
11. Filling the siphon with water
............................................................................................. 30
•
•
•
12. Checking all connections on the heating water side and DHW side for leaks
•
13. Designating heating circuits - only for weather-compensated control units
............... 31
•
•
14. Checking the gas type
....................................................................................................... 31
•
15. Gas type conversion (only for operation with LPG)
....................................................... 31
•
•
•
16. Checking the static pressure and supply pressure
........................................................ 32
•
•
•
17. Function sequence and possible faults
........................................................................... 33
•
18. Setting the maximum heating output
............................................................................... 34
•
19. Tightness test on balanced flue system (annular gap check)
....................................... 34
•
20. Removing the burner
......................................................................................................... 35
•
•
21. Checking the burner gasket and burner gauze assembly
.............................................. 36
•
•
22. Checking and adjusting the ignition and ionisation electrodes
.................................... 37
•
23. Cleaning the heating surfaces
.......................................................................................... 37
•
•
24. Checking the condensate drain and cleaning the siphon
.............................................. 37
•
•
25. Installing the burner
........................................................................................................... 39
•
•
26. Checking the neutralising system (if installed)
•
27. Checking the anode connection
....................................................................................... 39
•
28. Checking the anode earth current with an anode tester
................................................ 40
•
29. Draining the boiler on the DHW side
................................................................................ 41
•
30. Cleaning the loading cylinder
........................................................................................... 41
•
31. Checking and replacing the magnesium anode (if required)
......................................... 42
•
32. Re-assembling and filling the loading cylinder
............................................................... 42
•
•
•
33. Checking the expansion vessel and system pressure
................................................... 43
•
34. Checking the pre-charge pressure and the DHW expansion vessel (if installed)
........ 44
•
•
•
35. Checking the function of the safety valves
•
•
•
36. Checking the firm seating of electrical connections
•
•
•
37. Checking all gas equipment for tightness at operating pressure
................................. 44
•
•
38. Checking the combustion quality
..................................................................................... 44
•
•
•
39. Checking the flue system for unrestricted flow and tightness
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
5773 216 GB
Содержание B2TA
Страница 12: ...12 2 5 1 4 2x 3 Fig 5 Installing the boiler Removing the front panels 5773 216 GB Installation ...
Страница 13: ...13 1 2 SW17 Fig 6 Installing the boiler Siting and levelling the boiler 5773 216 GB Installation ...
Страница 23: ...23 4 1 5 2 2x 3 Fig 16 Installing the boiler Fitting the front panels 5773 216 GB Installation ...
Страница 101: ...101 Parts lists Overview of assemblies 5773 216 GB Components ...
Страница 107: ...107 Parts lists Hydraulics 5773 216 GB Components ...
Страница 118: ...118 0004 0002 0005 0006 0001 0003 Fig 77 Parts lists Miscellaneous 5773 216 GB Components ...
Страница 142: ...142 5773 216 GB ...
Страница 143: ...143 5773 216 GB ...