36
Check burner gasket
A
and burner gauze assembly
E
for possible damage and replace if required.
A
C
2x
2x
B
D
E
F
Fig. 27
1.
Remove electrodes
B
.
2.
Undo 2 retaining clips
C
on thermal insulation ring
D
and then remove thermal insulation ring
D
.
3.
Undo 2 Torx screws and remove burner gauze
assembly
E
with gasket
F
.
4.
Insert new burner gauze assembly
E
with new
gasket
F
and secure.
Torque: 5.0 Nm.
5.
Fit thermal insulation ring
D
.
6.
Fit electrodes
B
.
Torque: 4.5 Nm.
Commissioning, inspection, maintenance
Checking the burner gasket and burner gauze assembly
5773 216 GB
Содержание B2TA
Страница 12: ...12 2 5 1 4 2x 3 Fig 5 Installing the boiler Removing the front panels 5773 216 GB Installation ...
Страница 13: ...13 1 2 SW17 Fig 6 Installing the boiler Siting and levelling the boiler 5773 216 GB Installation ...
Страница 23: ...23 4 1 5 2 2x 3 Fig 16 Installing the boiler Fitting the front panels 5773 216 GB Installation ...
Страница 101: ...101 Parts lists Overview of assemblies 5773 216 GB Components ...
Страница 107: ...107 Parts lists Hydraulics 5773 216 GB Components ...
Страница 118: ...118 0004 0002 0005 0006 0001 0003 Fig 77 Parts lists Miscellaneous 5773 216 GB Components ...
Страница 142: ...142 5773 216 GB ...
Страница 143: ...143 5773 216 GB ...